{
  "id": 12549,
  "bill": "HB0117",
  "lsoNumber": null,
  "catchTitle": "Omnibus water bill-construction.",
  "sponsor": "Water",
  "lastAction": "Assigned Chapter Number 111",
  "lastActionDate": "2025-03-04T00:00:00",
  "billTitle": "AN ACT relating to water development projects; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing grants; providing loans; providing appropriations; amending the sponsor's contingency fund; amending amounts and terms of appropriations for specified prior projects; transferring funds from water development account I to water development account II; transferring projects; repealing a project; authorizing one full‑time position; making conforming amendments; and providing for an effective date.",
  "introduced": "2025/Introduced/HB0117.pdf",
  "substitute": null,
  "fiscalNote": "2025/Fiscal/HB0117.pdf",
  "concurrenceLink": "2025/Concurrences/HB0117.pdf",
  "digest": "2025/Digest/HB0117.pdf",
  "engrossedVersion": "2025/Engross/HB0117.pdf",
  "enrolledAct": "2025/Enroll/HB0117.pdf",
  "chapter": "CH0111",
  "summary": "2025/Summaries/HB0117.pdf",
  "veto": null,
  "billType": "HB",
  "signedDate": "3/4/2025",
  "effectiveDate": "3/4/2025",
  "enrolledNumber": "HEA0056",
  "vetoLinkText": null,
  "customEnrolledLinkText": null,
  "customEnrolledPath": null,
  "isPublic": null,
  "billStatus": "enrolled",
  "sponsorStringSenate": "",
  "sponsorStringHouse": "",
  "fiscalNoteHTML": "<html><head><meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" /><meta http-equiv=\"Content-Style-Type\" content=\"text/css\" /><meta name=\"generator\" content=\"Aspose.Words for .NET 23.4.0\" /><title>Fiscal Note - 25LSO-0452</title></head><body style=\"font-family:'Courier New'; font-size:11pt\"><div><div style=\"-aw-headerfooter-type:header-primary; clear:both\"><table cellspacing=\"0\" cellpadding=\"0\" style=\"border-collapse:collapse\"><tr><td style=\"width:296.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; font-size:11pt\"><span>Omnibus water bill-construction.</span></p></td><td style=\"width:197.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; font-size:11pt\"><span>25LSO-0452, 1.0</span></p></td></tr></table><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"width:216pt; display:inline-block; -aw-tabstop-align:center; -aw-tabstop-pos:216pt\">&#xa0;</span><span style=\"width:216pt; display:inline-block; -aw-tabstop-align:right; -aw-tabstop-pos:432pt\">&#xa0;</span></p></div><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold; text-decoration:underline\">FISCAL NOTE</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>This bill contains appropriations of $14,788,031 from WATER DEVELOPMENT ACCOUNT I to the Water Development Commission.</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>These appropriations are effective immediately.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>This bill contains appropriations of $99,994,331 from WATER DEVELOPMENT ACCOUNT II to the Water Development Commission.</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>These appropriations are effective immediately.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>This bill contains an appropriation of $20,000,000 from the LEGISLATIVE STABILIZATION RESERVE ACCOUNT to WATER DEVELOPMENT ACCOUNT II for the Goshen Irrigation District Tunnels 1 and 2 Rehabilitation project. This appropriation is effective immediately.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>This bill contains an appropriation of $60,000,000 from the LEGISLATIVE STABILIZATION RESERVE ACCOUNT to WATER DEVELOPMENT ACCOUNT II for the LaPrele Dam Rehabilitation project. This appropriation shall be reduced one dollar ($1.00) for each one dollar ($1.00) appropriated from WATER DEVELOPMENT ACCOUNT II for the project, up to $50,000,000. The net action results in a total appropriation of $60,000,000 ($50,000,000 from WATER DEVELOPMENT ACCOUNT II and $10,000,000 from the LEGISLATIVE STABILIZATION RESERVE ACCOUNT) for the LaPrele Dam Rehabilitation project. This appropriation is effective immediately.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>This bill contains an appropriation reduction of ($50,000,000) from WATER DEVELOPMENT ACCOUNT III for the Alkali Creek Reservoir project.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>This bill contains a transfer of $50,000,000 from WATER DEVELOPMENT ACCOUNT III to WATER DEVELOPMENT ACCOUNT II for the LaPrele Dam Rehabilitation project.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>This bill authorizes a transfer of $4,200,000 from WATER DEVELOPMENT I to WATER DEVELOPMENT II.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid\"><span>DETAIL OF APPROPRIATION</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid\"><span>Agency #: 029</span><span style=\"-aw-import:spaces\">&#xa0;&#xa0;&#xa0;&#xa0;&#xa0;&#xa0; </span><span>Agency Name: Water Development Commission</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid\"><span>Unit: (new) numerous</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><table cellspacing=\"0\" cellpadding=\"0\" style=\"width:100%; border-collapse:collapse\"><tr style=\"page-break-inside:avoid\"><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span style=\"font-weight:bold\">EXPENDITURE BY SERIES AND YEAR</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center; font-size:11pt\"><span style=\"font-weight:bold\">FY 2025</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center; font-size:11pt\"><span style=\"font-weight:bold\">FY 2026</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center; font-size:11pt\"><span style=\"font-weight:bold\">FY 2027</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span>0200 Supportive Services Costs</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$0</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$10,000</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$0</span><span>&#xa0;</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span>0600 Grant &amp; Aid Payments</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$5,679,260</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$39,754,827</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$68,151,132</span><span>&#xa0;</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span>0900 Contractual Services Costs</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$0</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$1,187,143</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$0</span><span>&#xa0;</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span>Total Expenditure Per Year:</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$5,679,260</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$40,951,970</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$68,151,132</span><span>&#xa0;</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span>Grand Total Expenditure:</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$114,782,362</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span>Total Appropriated to Agency:</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$114,782,362</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span>Total Appropriated by Fund:</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span>WATER DEVELOPMENT I</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$14,788,031</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-after:avoid; font-size:11pt\"><span>WATER DEVELOPMENT II</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span>$99,994,331</span><span>&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; page-break-after:avoid; font-size:11pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr></table><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>Description of appropriations:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>Most of the appropriations will be expended as 0600 series Grant &amp; Aid Payments to project sponsors (municipalities, irrigation districts, and special districts) for the design, permit procurement, land acquisition, construction engineering and construction of new water development, water rehabilitation, and water storage projects. Funds will also be expended for weather modification cloud seeding operations in the Wind River, Sierra Madre, and Medicine Bow Mountain Ranges for the winter of calendar year 2025 and 2026. It is anticipated that these funds will be expended from the 0200 series Supportive Services Costs ($5,000) and the 0900 series Contractual Services Costs ($1,192,143). </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>Prepared by:</span><span style=\"-aw-import:spaces\">&#xa0; </span><span style=\"text-decoration:underline; -aw-import:spaces\">&#xa0;</span><span style=\"text-decoration:underline\">Catherine Camarotte, LSO</span><span style=\"width:30.56pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>Phone:</span><span style=\"text-decoration:underline\"> 777-7881</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>(Information provided by Jason Mead, Water Development Commission, 307-777-7626)</span></p><div style=\"-aw-headerfooter-type:footer-primary; clear:both\"><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"width:216pt; display:inline-block; -aw-tabstop-align:center; -aw-tabstop-pos:216pt\">&#xa0;</span><span style=\"width:216pt; display:inline-block; -aw-tabstop-align:right; -aw-tabstop-pos:432pt\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>HB0117</span></p></div></div></body></html>",
  "currentBillHTML": "<html><head><meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" /><meta http-equiv=\"Content-Style-Type\" content=\"text/css\" /><meta name=\"generator\" content=\"Aspose.Words for .NET 23.4.0\" /><title>25LSO-0452</title></head><body style=\"text-align:justify; line-height:200%; font-family:'Courier New'; font-size:12pt\"><div><div style=\"-aw-different-first-page:true; -aw-headerfooter-type:header-primary; clear:both\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:left; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:left; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:left; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:left; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:left; line-height:normal\"><span style=\"text-transform:uppercase\">ORIGINAL House</span><span style=\"width:266.37pt; text-transform:uppercase; display:inline-block; -aw-tabstop-align:right; -aw-tabstop-pos:432pt\">&#xa0;</span><span style=\"text-transform:uppercase\">ENGROSSED</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:left; line-height:normal\"><span style=\"text-transform:uppercase\">Bill No</span><span>. </span><span style=\"text-decoration:underline\">HB0117</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:54pt; margin-bottom:0pt; line-height:normal\"><span style=\"text-transform:uppercase\">ENROLLED ACT NO. 56,</span><span style=\"font-weight:bold; text-transform:uppercase\"> </span><span style=\"text-transform:uppercase\">HOUSE OF REPRESENTATIVES</span></p><p style=\"margin-top:0pt; margin-left:54pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:54pt; margin-bottom:0pt; line-height:normal\"><span style=\"text-transform:uppercase\">SIXTY-EIGHTH LEGISLATURE OF THE STATE OF WYOMING</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center; line-height:normal\"><span style=\"text-transform:uppercase\">2025 General Session</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></div><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>AN ACT relating to water development projects; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing grants; providing loans; providing appropriations; amending the sponsor's contingency fund; amending amounts and terms of appropriations for specified prior projects; transferring funds from water development account I to water development account II; transferring projects; repealing a project; authorizing one full‑time position; making conforming amendments; and providing for an effective date.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"font-style:italic\">Be It Enacted by the Legislature of the State of Wyoming:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">Section 1.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span>W.S. 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>3001 through 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>3004 are created to read:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span>ARTICLE 30</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center; line-height:normal\"><span>2025 CONSTRUCTION PROJECTS</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3001.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Definitions.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>The definitions in W.S. 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>101 apply to this article. Source Notes: (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal; font-size:11.5pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3002.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">General authorization.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>The provisions of W.S. 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>102 apply to this article. Source Notes: (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span>&#x2011;</span><span style=\"font-weight:bold\">3</span><span>&#x2011;</span><span style=\"font-weight:bold\">3003.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects – new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt\"><span>(a)</span><span>&#xa0;</span><span>&#xa0;</span><span>Authorization is granted for the Level III new development construction projects identified in this section subject to the general conditions specified in W.S. 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>103, provided that W.S. 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>103(a)(iii) shall not apply to the projects identified in this section unless required by W.S. 41</span><span>&#x2011;</span><span>2</span><span>&#x2011;</span><span>121. Source Notes for subsection (a): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Big Horn Regional JPB South Transmission Project 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Big Horn Regional Joint Powers Board;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Municipal and rural domestic water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and pre</span><span>&#x2011;</span><span>construction of water transmission pipelines, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Eight hundred ten thousand dollars ($810,000.00); </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement and pre</span><span>&#x2011;</span><span>construction engineering of the project an amount not to exceed four hundred five thousand dollars ($405,000.00) or fifty percent (50%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriations: There is appropriated from water development account I to the commission four hundred five thousand dollars ($405,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources. Source Notes for subsection (b): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(c)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Cloud Seeding: Wind River and Sierra Madre mountain ranges 2026 (ground</span><span>&#x2011;</span><span>based):</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: The state of Wyoming;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: To enhance the winter snowpack in the Wind River and Sierra Madre mountain ranges;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Conduct a ground</span><span>&#x2011;</span><span>based operational winter snowpack augmentation program during the 2025</span><span>&#x2011;</span><span>2026 season;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Eight hundred sixty</span><span>&#x2011;</span><span>two thousand one hundred forty</span><span>&#x2011;</span><span>three dollars ($862,143.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: Prior to commencing project operations, the Wyoming water development office shall acquire funding commitments from other Colorado River basin water users or other interested parties for a minimum of one hundred percent (100%) of actual project operations costs. Source Notes for subsection (c): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(d)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Hoback Junction Public Water System 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Hoback Junction Water and Sewer District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Rural domestic water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and pre</span><span>&#x2011;</span><span>construction of a diversion structure, pumping facilities, water transmission pipelines, tank, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Five hundred forty</span><span>&#x2011;</span><span>eight thousand nine hundred dollars ($548,900.00); </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement and pre</span><span>&#x2011;</span><span>construction engineering of the project an amount not to exceed two hundred seventy</span><span>&#x2011;</span><span>four thousand four hundred fifty dollars ($274,450.00) or fifty percent (50%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriations: There is appropriated from water development account I to the commission two hundred seventy</span><span>&#x2011;</span><span>four thousand four hundred fifty dollars ($274,450.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources. Source Notes for subsection (d): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(e)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – SAWS JPB Upper Road Transmission Main Phase I 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Sheridan Area Water Supply Joint Powers Board;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Municipal and rural domestic water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of water transmission pipelines, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Four million four hundred thirteen thousand five hundred dollars ($4,413,500.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million two hundred six thousand seven hundred fifty dollars ($2,206,750.00) or fifty percent (50%) of these actual development costs, whichever is less; </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission two million two hundred six thousand seven hundred fifty dollars ($2,206,750.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources. Source Notes for subsection (e): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(f)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project </span><span>&#x2011;</span><span> Small Water Development Projects – New Development 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Eligible public entities;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Multi</span><span>&#x2011;</span><span>purpose </span><span>&#x2011;</span><span> agriculture, recreation and environmental;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Small dams, windmills, springs, guzzlers and other water collection, storage and drinking systems, pipelines, etc., to impound, develop and convey water for livestock, wildlife, irrigation, environmental and recreational purposes;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Three million dollars ($3,000,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to sponsors of small water development projects from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project a total amount not to exceed one million five hundred thousand dollars ($1,500,000.00) or fifty percent (50%) of the actual development costs of the small water development projects, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission one million five hundred thousand dollars ($1,500,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Definition: \"Small water development project\" means a project where the maximum financial contribution from the commission is thirty</span><span>&#x2011;</span><span>five thousand dollars ($35,000.00) or less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(viii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(A)</span><span>&#xa0;</span><span>&#xa0;</span><span>The commission may grant a sponsor fifty percent (50%) of the design, permit procurement, project land procurement, construction engineering and construction cost of a small project. No grant shall be more than thirty</span><span>&#x2011;</span><span>five thousand dollars ($35,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(B)</span><span>&#xa0;</span><span>&#xa0;</span><span>The small water development project sponsors shall substantiate the public benefit that will be derived from proposed small water development projects;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(C)</span><span>&#xa0;</span><span>&#xa0;</span><span>The commission may make monthly progress payments for no more than fifty percent (50%) of eligible monthly project expenses;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(D)</span><span>&#xa0;</span><span>&#xa0;</span><span>An appropriate land management or resource management entity shall certify that the proposed small water development project will meet expectations and that appropriate engineering standards, as approved by the commission, will be adhered to;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(E)</span><span>&#xa0;</span><span>&#xa0;</span><span>The establishment of criteria and administrative procedures for the development of small water development projects under this subsection and decisions of the commission relating to the recommendations, prioritization or disqualification of small water development projects are specifically exempt from the provisions of the Wyoming Administrative Procedure Act including judicial review under W.S. 16</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>114 and 16</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>115;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(F)</span><span>&#xa0;</span><span>&#xa0;</span><span>W.S. 16</span><span>&#x2011;</span><span>6</span><span>&#x2011;</span><span>116 shall not apply to a small water development project unless the project sponsor determines the small water development project meets the definition of a \"public work\" as defined in W.S. 16</span><span>&#x2011;</span><span>6</span><span>&#x2011;</span><span>101(a)(ix). Source Notes for subsection (f): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3004.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects – rehabilitation.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(a)</span><span>&#xa0;</span><span>&#xa0;</span><span>Authorization is granted for the Level III rehabilitation construction projects identified in this section subject to the general conditions specified in W.S. 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>104, provided that W.S. 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>104(a)(iii) shall not apply to the projects identified in this section unless required by W.S. 41</span><span>&#x2011;</span><span>2</span><span>&#x2011;</span><span>121. Source Notes for subsection (a): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – CAID Lateral 256 Check Structure Rehabilitation 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Casper Alcova Irrigation District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Agricultural water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of a check structure and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Seven hundred forty</span><span>&#x2011;</span><span>five thousand dollars ($745,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred seventy</span><span>&#x2011;</span><span>two thousand five hundred dollars ($372,500.00) or fifty percent (50%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission three hundred seventy</span><span>&#x2011;</span><span>two thousand five hundred dollars ($372,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources. Source Notes for subsection (b): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(c)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Casper Tank Replacement 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: City of Casper;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Municipal water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of water transmission pipelines, tanks, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Eleven million three hundred forty</span><span>&#x2011;</span><span>four thousand dollars ($11,344,000.00); </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed five million six hundred seventy</span><span>&#x2011;</span><span>two thousand dollars ($5,672,000.00) or fifty percent (50%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission five million six hundred seventy</span><span>&#x2011;</span><span>two thousand dollars ($5,672,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources. Source Notes for subsection (c): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(d)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Cottonwood Irrigation District Pipeline Replacement 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Cottonwood Irrigation District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Agricultural water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of pipelines, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: One million one hundred two thousand dollars ($1,102,000.00); </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed five hundred fifty</span><span>&#x2011;</span><span>one thousand dollars ($551,000.00) or fifty percent (50%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement and project land procurement of the project an amount not to exceed forty</span><span>&#x2011;</span><span>seven thousand dollars ($47,000.00) or fifty percent (50%) of these actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%); </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission five hundred ninety</span><span>&#x2011;</span><span>eight thousand dollars ($598,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(viii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring forty</span><span>&#x2011;</span><span>five and seventy</span><span>&#x2011;</span><span>four hundredths percent (45.74%) of the total project budget from other sources. Source Notes for subsection (d): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(e)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – EVIDD Farson Lateral Phase 4A 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Eden Valley Irrigation and Drainage District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Agricultural water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Construction of pipelines, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Four million four hundred fifty thousand dollars ($4,450,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the permit procurement, project land procurement and construction of the project an amount not to exceed one million one hundred twelve thousand five hundred dollars ($1,112,500.00) or twenty</span><span>&#x2011;</span><span>five percent (25%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission one million one hundred twelve thousand five hundred dollars ($1,112,500.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring seventy</span><span>&#x2011;</span><span>five percent (75%) of the total project budget from other sources. Source Notes for subsection (e): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(f)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – GID 62.2 Check Structure Project 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Goshen Irrigation District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Agricultural water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of a check structure and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: One million three hundred twenty</span><span>&#x2011;</span><span>two thousand dollars ($1,322,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six hundred sixty</span><span>&#x2011;</span><span>one thousand dollars ($661,000.00) or fifty percent (50%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six hundred sixty</span><span>&#x2011;</span><span>one thousand dollars ($661,000.00) or fifty percent (50%) of these actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission one million three hundred twenty</span><span>&#x2011;</span><span>two thousand dollars ($1,322,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030. Source Notes for subsection (f): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(g)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Kirby Creek Spillway Replacement 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Kirby Ditch Irrigation District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Agricultural water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of a spillway and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Five hundred fifty</span><span>&#x2011;</span><span>four thousand dollars ($554,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred seventy</span><span>&#x2011;</span><span>seven thousand dollars ($277,000.00) or fifty percent (50%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two hundred seventy</span><span>&#x2011;</span><span>seven thousand dollars ($277,000.00) or fifty percent (50%) of these actual development costs, whichever is less, for a term of thirty (30) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission five hundred fifty</span><span>&#x2011;</span><span>four thousand dollars ($554,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030. Source Notes for subsection (g): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(h)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Meeteetse Trails Estates 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Town of Meeteetse;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Municipal water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of water storage tank and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: One million one hundred eighty</span><span>&#x2011;</span><span>one thousand dollars ($1,181,000.00); </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred twenty</span><span>&#x2011;</span><span>four thousand five hundred eighty</span><span>&#x2011;</span><span>one dollars ($324,581.00) or twenty</span><span>&#x2011;</span><span>seven and five</span><span>&#x2011;</span><span>tenths percent (27.5%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission three hundred twenty</span><span>&#x2011;</span><span>four thousand five hundred eighty</span><span>&#x2011;</span><span>one dollars ($324,581.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring seventy</span><span>&#x2011;</span><span>two and five‑tenths percent (72.5%) of the total project budget from other sources. Source Notes for subsection (h): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(j)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Rawlins Sage Creek Pipeline 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: City of Rawlins;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Municipal water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of blowoffs, air and vacuum stations, inline valves and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Five million six hundred seventy thousand dollars ($5,670,000.00); </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed two million eight hundred thirty</span><span>&#x2011;</span><span>five thousand dollars ($2,835,000.00) or fifty percent (50%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission two million eight hundred thirty</span><span>&#x2011;</span><span>five thousand dollars ($2,835,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources. Source Notes for subsection (j): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(k)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Sidon ID Canal Crossing 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Sidon Irrigation District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Agricultural water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of culverts, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Eight hundred ninety</span><span>&#x2011;</span><span>five thousand one hundred ten dollars ($895,110.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the purchase of project materials as supported by vendor invoices and as approved by the commission an amount not to exceed four hundred thirty</span><span>&#x2011;</span><span>two thousand dollars ($432,000.00) or one hundred percent (100%) of the approved materials costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:8pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission four hundred thirty</span><span>&#x2011;</span><span>two thousand dollars ($432,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(A)</span><span>&#xa0;</span><span>&#xa0;</span><span>The sponsor is responsible for all project costs with the exception of the purchase of project materials as supported by vendor invoices and as approved by the commission, up to the amount appropriated in this subsection;</span></p><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(B)</span><span>&#xa0;</span><span>&#xa0;</span><span>The sponsor is responsible for retaining professional engineering services to design the project, compile materials and bidding documents and monitor construction activities including the installation of project components and the tracking of project expenditures. Source Notes for subsection (k): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(m)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project </span><span>&#x2011;</span><span> Small Water Development Projects – Rehabilitation 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Eligible public entities;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Multi</span><span>&#x2011;</span><span>purpose </span><span>&#x2011;</span><span> agriculture, recreation and environmental;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Rehabilitation and replacement of small dams, windmills, springs, guzzlers and other water collection, storage and drinking systems, pipelines, etc., to impound, develop and convey water for livestock, wildlife, irrigation, environmental and recreational purposes;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: One million dollars ($1,000,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to sponsors of small water development projects from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of small water development projects a total amount not to exceed five hundred thousand dollars ($500,000.00) or fifty percent (50%) of the actual development costs of the small water development projects, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission five hundred thousand dollars ($500,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Definition: \"Small water development project\" means a project where the maximum financial contribution from the commission is thirty</span><span>&#x2011;</span><span>five thousand dollars ($35,000.00) or less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(viii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(A)</span><span>&#xa0;</span><span>&#xa0;</span><span>The commission may grant a sponsor fifty percent (50%) of the design, permit procurement, project land procurement, construction engineering and construction cost of a small water development project. No grant shall be more than thirty</span><span>&#x2011;</span><span>five thousand dollars ($35,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(B)</span><span>&#xa0;</span><span>&#xa0;</span><span>The small water development project sponsors shall substantiate the public benefit that will be derived from proposed small water development projects;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(C)</span><span>&#xa0;</span><span>&#xa0;</span><span>The commission may make monthly progress payments for not more than fifty percent (50%) of eligible monthly project expenses;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(D)</span><span>&#xa0;</span><span>&#xa0;</span><span>An appropriate land management or resource management entity shall certify that the proposed small water development project will meet expectations and that appropriate engineering standards, as approved by the commission, will be adhered to;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(E)</span><span>&#xa0;</span><span>&#xa0;</span><span>The establishment of criteria and administrative procedures for the development of small water development projects under this subsection and decisions of the commission relating to the recommendations, prioritization or disqualification of small water development projects are specifically exempt from the provisions of the Wyoming Administrative Procedure Act including judicial review under W.S. 16</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>114 and 16</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>115;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(F)</span><span>&#xa0;</span><span>&#xa0;</span><span>W.S. 16</span><span>&#x2011;</span><span>6</span><span>&#x2011;</span><span>116 shall not apply to a small water development project unless the project sponsor determines the small water development project meets the definition of a \"public work\" as defined in W.S. 16</span><span>&#x2011;</span><span>6</span><span>&#x2011;</span><span>101(a)(ix). Source Notes for subsection (m): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(n)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Upper Bluff Pump Plant No. 1 Pipeline 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Upper Bluff Irrigation District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Agricultural water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of pipelines, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Seven hundred thirteen thousand five hundred dollars ($713,500.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred fifty</span><span>&#x2011;</span><span>six thousand seven hundred fifty dollars ($356,750.00) or fifty percent (50%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission three hundred fifty</span><span>&#x2011;</span><span>six thousand seven hundred fifty dollars ($356,750.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring fifty percent (50%) of the total project budget from other sources. Source Notes for subsection (n): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(o)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – West Afton ID Phase I Project 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: West Afton Irrigation District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Agricultural water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of pipelines, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: One million three hundred seventeen thousand dollars ($1,317,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six hundred fifty</span><span>&#x2011;</span><span>eight thousand five hundred dollars ($658,500.00) or fifty percent (50%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed six hundred fifty</span><span>&#x2011;</span><span>eight thousand five hundred dollars ($658,500.00) or fifty percent (50%) of these actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission one million three hundred seventeen thousand dollars ($1,317,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(viii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions:</span><span style=\"width:21.57pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>The appropriation of funds for this project is contingent upon the transfer of funds to water development account II as described in section 4 of this act or transfer from another funding source. Source Notes for subsection (o): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(p)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Willwood ID Willwood Chute 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: Willwood Irrigation District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Agricultural water supply;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of a chute, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: One million six hundred ninety</span><span>&#x2011;</span><span>eight thousand dollars ($1,698,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed seven hundred ninety</span><span>&#x2011;</span><span>eight thousand dollars ($798,000.00) or forty</span><span>&#x2011;</span><span>seven percent (47%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project loan: The state of Wyoming shall loan to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed nine hundred thousand dollars ($900,000.00) or fifty</span><span>&#x2011;</span><span>three percent (53%) of these actual development costs, whichever is less, for a term of twenty (20) years from the date the commission determines that project benefits accrue to the sponsor, at an annual interest rate of four percent (4%);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission one million six hundred ninety</span><span>&#x2011;</span><span>eight thousand dollars ($1,698,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, 2030. Source Notes for subsection (p): (Laws 2025, Ch. 111, § 1.)</span></p><p style=\"margin-top:0pt; margin-bottom:6pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">Section 2.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span>W.S. 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>303(b)(ii), (iii) and (iv) by creating a new subdivision (F), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>1106(b)(iv), (vi), (vii) and (viii)(B), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>1503(g)(vi), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2003(b)(vi), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2203(b)(iv) through (vi), (vii)(B) and (e)(vi), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2205(c)(v) and (d)(vii), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2303(b)(vi), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2404(e)(iv) through (vii), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2406(h)(iii) through (vi) and (vii)(A), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2503(f)(vi), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2504(g)(vii) and (j)(vii), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2603(d)(iv) through (vi), 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2803(f)(iii) through (vi) and 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2904(f)(iv) through (vi), (j)(iv) through (vi) and by creating a new paragraph (vii) are amended to read: </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">303.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project </span><span>&#x2011;</span><span> Aladdin Water Supply Project:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: Municipal</span><span style=\"text-decoration:line-through; color:#0000ff\">, domestic and to provide</span><span> </span><span style=\"text-decoration:underline; color:#ff0000\">and rural domestic</span><span> water </span><span style=\"text-decoration:line-through; color:#0000ff\">to facilitate highway construction </span><span style=\"text-decoration:underline; color:#ff0000\">supply</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Authorization for the commission to </span><span style=\"text-decoration:line-through; color:#0000ff\">sell water from a well constructed from water development program funds to the Aladdin Water District and to the Wyoming department of transportation </span><span style=\"text-decoration:underline; color:#ff0000\">transfer ownership of the Project</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special Conditions:</span></p><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span style=\"text-decoration:underline; color:#ff0000\">(F)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">Notwithstanding any other provision of law, the commission shall transfer to the Aladdin Water District all rights, title and interest to the Project, to include the well and associated parcel of real property upon occurrence of all the following:</span></p><p style=\"margin-top:10pt; margin-bottom:0pt; text-indent:108pt; line-height:normal; padding-left:20pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:144pt; line-height:normal\"><span style=\"text-decoration:underline; color:#ff0000\">(I)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">Expiration of any existing water service contract between the commission and the Aladdin Water District;</span><span> </span></p><p style=\"margin-top:10pt; margin-bottom:0pt; text-indent:144pt; line-height:normal; padding-left:20pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:144pt; line-height:normal\"><span style=\"text-decoration:underline; color:#ff0000\">(II)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">A finding by the commission that it has no further Project related interest;</span><span> </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:144pt; line-height:normal\"><span style=\"text-decoration:underline; color:#ff0000\">(III)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">Execution of an agreement between the commission and Aladdin Water District to transfer the Project. Source Notes for subsection (b): (Laws 1999, Ch. 16, § 1; 2025, Ch. 111, § 2.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">1106.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Sponsor's Contingency Funds.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Sponsor's Contingency Fund</span><span>&#x2011;</span><span>Rehabilitation:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: </span><span style=\"text-decoration:line-through; color:#0000ff\">Five million seven hundred thousand dollars ($5,700,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">Eight million six hundred thousand dollars ($8,600,000.00)</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project loan: The state of Wyoming shall loan to sponsors from water development account II through the commission sufficient supplemental funds which may be used to complete construction of projects up to an amount not to exceed </span><span style=\"text-decoration:line-through; color:#0000ff\">thirty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">three percent (33%) </span><span style=\"text-decoration:underline; color:#ff0000\">fifty percent (50%)</span><span> of the difference between the original project budget and the actual cost of construction, at an annual rate of four percent (4%); </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission </span><span style=\"text-decoration:line-through; color:#0000ff\">five million seven hundred thousand dollars ($5,700,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">eight million six hundred thousand dollars ($8,600,000.00)</span><span> or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2027 </span><span style=\"text-decoration:underline; color:#ff0000\">2028</span><span>; and</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(viii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special condition: </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(B)</span><span>&#xa0;</span><span>&#xa0;</span><span>The appropriation of additional funds for this project in the amount of </span><span style=\"text-decoration:line-through; color:#0000ff\">one million two hundred thousand dollars ($1,200,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">two million nine hundred thousand dollars ($2,900,000.00)</span><span> is contingent upon the transfer of funds to water development account II as described in </span><span style=\"text-decoration:line-through; color:#0000ff\">section 3 of </span><span>this act or the transfer of funds from another funding source. </span><span style=\"text-decoration:underline; color:#ff0000\">Source Notes for subsection (b): (Laws 2006, Ch. 105, § 20; 2010, Ch. 68, § 2; 2012, Ch. 14, § 2; 2015, Ch. 167, § 1, 2017, Ch. 75, § 2; 2019, Ch. 55, § 2; 2020, Ch. 113, § 2; 2021, Ch. 12, § 2; 2023, Ch. 180, § 2; 2025, Ch. 111, § 2.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">1503.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects ‑ new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(g)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project ‑ Ethete Water Supply:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission two million dollars ($2,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2003.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects ‑ new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project ‑ Arapahoe Pipeline and Tank:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission two million four hundred twenty thousand dollars ($2,420,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2203.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects – new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Broken Wheel Ranch Water Supply 2017:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: </span><span style=\"text-decoration:line-through; color:#0000ff\">Nine hundred fifteen thousand dollars ($915,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">One million eight hundred forty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">nine thousand four hundred eighty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">seven dollars ($1,849,487.00)</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed </span><span style=\"text-decoration:line-through; color:#0000ff\">six hundred thirteen thousand fifty dollars ($613,050.00) or sixty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">seven percent (67%) </span><span style=\"text-decoration:underline; color:#ff0000\">nine hundred thirteen thousand fifty dollars ($913,050.00) or forty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">nine and four‑tenths percent (49.4%)</span><span> of the actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission </span><span style=\"text-decoration:line-through; color:#0000ff\">six hundred thirteen thousand fifty dollars ($613,050.00) </span><span style=\"text-decoration:underline; color:#ff0000\">nine hundred thirteen thousand fifty dollars ($913,050.00)</span><span style=\"color:#ff0000\"> </span><span>or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(B)</span><span>&#xa0;</span><span>&#xa0;</span><span>The sponsor is responsible for acquiring </span><span style=\"text-decoration:line-through; color:#0000ff\">thirty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">three percent (33%) </span><span style=\"text-decoration:underline; color:#ff0000\">fifty and six‑tenths percent (50.6%)</span><span style=\"color:#ff0000\"> </span><span>of the total project budget from other sources. </span><span style=\"text-decoration:underline; color:#ff0000\">Source Notes for subsection (b):</span><span style=\"text-decoration:underline; color:#ff0000; -aw-import:spaces\">&#xa0; </span><span style=\"text-decoration:underline; color:#ff0000\">(Laws 2017, Ch. 75, § 1; 2022, Ch. 93, § 2, 2023, Ch. 180, § 2; 2025, Ch. 111, § 2.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(e)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project </span><span>&#x2011;</span><span> Gillette Regional Extensions 2017:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission two million seven hundred fifty</span><span>&#x2011;</span><span>three thousand seven hundred dollars ($2,753,700.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2205.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects – dams and reservoirs.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(c)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Middle Piney Reservoir: </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account III to the commission for project land procurement, construction engineering and construction of the project fourteen million two hundred twenty</span><span>&#x2011;</span><span>eight thousand dollars ($14,228,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account III on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025</span><span style=\"color:#0000ff\"> </span><span style=\"text-decoration:underline; color:#ff0000\">2027</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(d)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Alkali Creek Reservoir:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account III to the commission fifty</span><span>&#x2011;</span><span>nine million dollars ($59,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account III on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>. </span><span style=\"text-decoration:underline; color:#ff0000\">Source Notes for subsection (d):</span><span style=\"text-decoration:underline; color:#ff0000; -aw-import:spaces\">&#xa0; </span><span style=\"text-decoration:underline; color:#ff0000\">(Laws 2017, Ch. 75, § 1; 2020, Ch. 113, § 2; 2025, Ch. 111, § 2.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2303.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects – new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project </span><span>&#x2011;</span><span> Gillette Regional Extensions Phase IV 2018:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission one million five hundred twelve thousand one hundred ninety dollars ($1,512,190.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2404.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects – new development. </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(e)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project GR/RS/SC JPWB Pump Station 2019:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: </span><span style=\"text-decoration:line-through; color:#0000ff\">Eleven million one hundred ninety thousand dollars ($11,190,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">Twenty million one hundred twenty thousand dollars ($20,120,000.00)</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed </span><span style=\"text-decoration:line-through; color:#0000ff\">seven million four hundred ninety</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">seven thousand three hundred dollars ($7,497,300.00) or sixty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">seven percent (67%) </span><span style=\"text-decoration:underline; color:#ff0000\">eleven million nine hundred sixty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">two thousand three hundred dollars ($11,962,300.00) or fifty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">nine and five‑tenths percent (59.5%)</span><span> of the actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission </span><span style=\"text-decoration:line-through; color:#0000ff\">seven million four hundred ninety</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">seven thousand three hundred dollars ($7,497,300.00) </span><span style=\"text-decoration:underline; color:#ff0000\">eleven million nine hundred sixty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">two thousand three hundred dollars ($11,962,300.00)</span><span style=\"color:#ff0000\"> </span><span>or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2026 </span><span style=\"text-decoration:underline; color:#ff0000\">2028</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: The sponsor is responsible for acquiring </span><span style=\"text-decoration:line-through; color:#0000ff\">thirty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">three percent (33%) </span><span style=\"text-decoration:underline; color:#ff0000\">forty and five‑tenths percent (40.5%)</span><span style=\"color:#ff0000\"> </span><span>of the total project budget from other sources. </span><span style=\"text-decoration:underline; color:#ff0000\">Source notes for subsection (e):</span><span style=\"text-decoration:underline; color:#ff0000; -aw-import:spaces\">&#xa0; </span><span style=\"text-decoration:underline; color:#ff0000\">(Laws 2019, Ch. 55, § 1, 2023, Ch. 180, § 2; 2025, Ch. 111, § 2.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2406.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects – rehabilitation. </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(h)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Eden Valley Irrigation District System Improvements 2019:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and construction of </span><span style=\"text-decoration:line-through; color:#0000ff\">canal lining, </span><span>sandtrap structure and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: </span><span style=\"text-decoration:line-through; color:#0000ff\">Six hundred fifty thousand dollars ($650,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">One million four hundred four thousand dollars ($1,404,000.00)</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed three hundred fifty</span><span>&#x2011;</span><span>one thousand dollars ($351,000.00) or</span><span style=\"color:#0000ff\"> </span><span style=\"text-decoration:line-through; color:#0000ff\">fifty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">four percent (54%) </span><span style=\"text-decoration:underline; color:#ff0000\">twenty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">five percent (25%)</span><span> of the actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission three hundred fifty</span><span>&#x2011;</span><span>one thousand dollars ($351,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2026 </span><span style=\"text-decoration:underline; color:#ff0000\">2028</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span>(A)</span><span>&#xa0;</span><span>&#xa0;</span><span>The sponsor is responsible for acquiring </span><span style=\"text-decoration:line-through; color:#0000ff\">forty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">six percent (46%) </span><span style=\"text-decoration:underline; color:#ff0000\">seventy</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">five percent (75%)</span><span> of the total project budget from other sources;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2503.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(f)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Gillette Regional Extensions Phase V 2020:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission three million eighty</span><span>&#x2011;</span><span>eight thousand seven hundred dollars ($3,088,700.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2027</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2504.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects – rehabilitation.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(g)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Enterprise Watershed Improvement District Canal Lining 2020:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission six hundred ten thousand dollars ($610,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2027</span><span>. Source Notes for subsection (g):</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>(Laws 2020, Ch. 113, § 1; 2025, Ch. 111, § 2.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(j)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Laramie Valley Diversion Structure 2020:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account II to the commission one million eight hundred fifty thousand dollars ($1,850,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account II on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2027</span><span>. Source Notes for subsection (j):</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>(Laws 2020, Ch. 113, § 1; 2022, Ch. 93, § 2; 2025, Ch. 111, § 2.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2603.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects – new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(d)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Lander Well and Transmission Pipeline 2021:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: </span><span style=\"text-decoration:line-through; color:#0000ff\">One million three hundred twenty thousand dollars ($1,320,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">Two million eight hundred fifty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">seven thousand four hundred dollars ($2,857,400.00)</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement, construction engineering and construction of the project an amount not to exceed </span><span style=\"text-decoration:line-through; color:#0000ff\">eight hundred eighty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">four thousand four hundred dollars ($884,400.00) </span><span style=\"text-decoration:underline; color:#ff0000\">one million nine hundred fourteen thousand four hundred fifty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">eight dollars ($1,914,458.00)</span><span> or sixty</span><span>&#x2011;</span><span>seven percent (67%) of the actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:spaces\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission </span><span style=\"text-decoration:line-through; color:#0000ff\">eight hundred eighty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">four thousand four hundred dollars ($884,400.00) </span><span style=\"text-decoration:underline; color:#ff0000\">one million nine hundred fourteen thousand four hundred fifty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">eight dollars ($1,914,458.00)</span><span> or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2026 </span><span style=\"text-decoration:underline; color:#ff0000\">2028</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2803.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects ‑ new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(f)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project ‑ South End Water Users ISD Pipeline 2023:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Design and </span><span style=\"text-decoration:line-through; color:#0000ff\">pre</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">construction </span><span style=\"text-decoration:underline; color:#ff0000\">construction</span><span> of water transmission pipelines, structures and appurtenances necessary to make the project function in the manner intended;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: </span><span style=\"text-decoration:line-through; color:#0000ff\">Four hundred fifty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">nine thousand four hundred three dollars ($459,403.00) </span><span style=\"text-decoration:underline; color:#ff0000\">Five million five hundred forty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">eight thousand four hundred three dollars ($5,548,403.00)</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account I through the commission for the design, permit procurement, project land procurement and </span><span style=\"text-decoration:line-through; color:#0000ff\">pre</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">construction </span><span style=\"text-decoration:underline; color:#ff0000\">construction</span><span> engineering </span><span style=\"text-decoration:underline; color:#ff0000\">and construction</span><span> of the project an amount not to exceed </span><span style=\"text-decoration:line-through; color:#0000ff\">three hundred seven thousand eight hundred dollars ($307,800.00) </span><span style=\"text-decoration:underline; color:#ff0000\">three million seven hundred seventeen thousand four hundred thirty dollars ($3,717,430.00)</span><span> or sixty</span><span>&#x2011;</span><span>seven percent (67%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission </span><span style=\"text-decoration:line-through; color:#0000ff\">three hundred seven thousand eight hundred dollars ($307,800.00) </span><span style=\"text-decoration:underline; color:#ff0000\">three million seven hundred seventeen thousand four hundred thirty dollars ($3,717,430.00)</span><span> or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2028; </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">99</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">3</span><span style=\"font-weight:bold\">&#x2011;</span><span style=\"font-weight:bold\">2904.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects ‑ rehabilitation.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(f)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project ‑ Goshen Irrigation District Tunnels 1 and 2 Rehabilitation:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: </span><span style=\"text-decoration:line-through; color:#0000ff\">Eighty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">four million dollars ($84,000,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">one hundred four million dollars ($104,000,000.00)</span><span>. The sponsor's project budget </span><span style=\"text-decoration:line-through; color:#0000ff\">is twenty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">one million eight hundred ten thousand dollars ($21,810,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">forty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">one million eight hundred ten thousand dollars ($41,810,000.00)</span><span> or forty</span><span>&#x2011;</span><span>nine percent (49%) of the total project budget, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the construction engineering and construction of the project an amount not to exceed </span><span style=\"text-decoration:line-through; color:#0000ff\">twenty</span><span style=\"text-decoration:line-through; color:#0000ff\">&#x2011;</span><span style=\"text-decoration:line-through; color:#0000ff\">one million eight hundred ten thousand dollars ($21,810,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">forty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">one million eight hundred ten thousand dollars ($41,810,000.00)</span><span> or one hundred percent (100%) of these actual development costs within the sponsor's project budget, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span style=\"text-decoration:underline; color:#ff0000\">(A)</span><span>&#xa0;</span><span>&#xa0;</span><span>2022 Wyoming Session Laws, Chapter 74, Section 1(a)(ii), as amended, appropriated twenty</span><span>&#x2011;</span><span>one million eight hundred ten thousand dollars ($21,810,000.00) to the commission to carry out the purpose of this subsection</span><span style=\"text-decoration:underline; color:#ff0000\">;</span><span style=\"text-decoration:line-through; color:#0000ff\">.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span style=\"text-decoration:underline; color:#ff0000\">(B)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">There is appropriated from the legislative stabilization reserve account to water development account II which shall be further appropriated from water development account II to the commission twenty million dollars ($20,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subparagraph shall revert to the legislative stabilization reserve account on July 1, 2032.</span><span style=\"text-decoration:underline; color:#ff0000; -aw-import:spaces\">&#xa0; </span><span style=\"text-decoration:underline; color:#ff0000\">Source Notes for subsection (f): (Laws 2024, Ch. 99, § 1; 2025, Ch. 111, § 2.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(j)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project ‑ LaPrele Dam Rehabilitation:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: </span><span style=\"text-decoration:line-through; color:#0000ff\">One hundred eighteen million dollars ($118,000,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">One hundred eighty</span><span style=\"text-decoration:underline; color:#ff0000\">&#x2011;</span><span style=\"text-decoration:underline; color:#ff0000\">two million dollars ($182,000,000.00)</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project grant: The state of Wyoming shall grant to the sponsor from water development account II through the commission for the design and construction of the project an amount not to exceed </span><span style=\"text-decoration:line-through; color:#0000ff\">thirty million dollars ($30,000,000.00) </span><span style=\"text-decoration:underline; color:#ff0000\">ninety million dollars ($90,000,000.00)</span><span> or one hundred percent (100%) of these actual development costs, whichever is less;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span style=\"text-decoration:underline; color:#ff0000\">(A)</span><span>&#xa0;</span><span>&#xa0;</span><span>2022 Wyoming Session Laws, Chapter 74, Section 1(a)(iii), as amended, appropriated thirty million dollars ($30,000,000.00) to the commission to carry out the purpose of this subsection</span><span style=\"text-decoration:underline; color:#ff0000\">;</span><span style=\"text-decoration:line-through; color:#0000ff\">.</span><span> </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; line-height:normal\"><span style=\"text-decoration:underline; color:#ff0000\">(B)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">There is appropriated from the legislative stabilization reserve account to water development account II which shall be further appropriated from water development account II to the commission sixty million dollars ($60,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subparagraph shall revert to water development account III on July 1, 2032.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; line-height:normal\"><span style=\"text-decoration:underline; color:#ff0000\">(vii)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">Special conditions:</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">Available federal funds shall be expended prior to the expenditure of funds appropriated under paragraph (vi) of this subsection. Source Notes for subsection (j): (Laws 2024, Ch. 99, § 1; 2025, Ch. 111, § 2.)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">Section 3.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span>W.S. 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>303(b)(iv)(A) through (E) and 99</span><span>&#x2011;</span><span>3</span><span>&#x2011;</span><span>2903(f) are repealed.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">Section 4.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(a)</span><span>&#xa0;</span><span>&#xa0;</span><span>The Wyoming water development commission is hereby authorized to transfer four million two hundred thousand dollars ($4,200,000.00) from water development account I created by W.S. 41</span><span>&#x2011;</span><span>2</span><span>&#x2011;</span><span>124(a)(i) to water development account II created by W.S. 41</span><span>&#x2011;</span><span>2</span><span>&#x2011;</span><span>124(a)(ii).</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>In accordance with W.S. 41</span><span>&#x2011;</span><span>2</span><span>&#x2011;</span><span>115(b), upon a finding that the transfer of test wells, Belvoir No. 5 and Belvoir No. 6, developed as part of the level II feasibility study authorized under 2004 Wyoming Session Laws, Chapter 34, Section 4, to the Cheyenne Board of Public Utilities (BOPU) is desirable and in the public interest and that BOPU is capable of constructing, operating and maintaining the project and accomplishing the public interest, the water development commission shall transfer to BOPU test wells, Belvoir No. 5 and Belvoir No. 6, developed as part of a level II feasibility study for further development by BOPU, provided agrees to terms outlined by the commission for reimbursement of the expense of predevelopment costs, an amount which shall be not less than two hundred eighteen thousand dollars ($218,000.00), payment for property and assurances of construction, operation and maintenance of the test wells, Belvoir No. 5 and Belvoir No. 6 in compliance with all applicable state and federal laws.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">Section 5. </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(a)</span><span>&#xa0;</span><span>&#xa0;</span><span>The state engineer's office is authorized up to one (1) full</span><span>&#x2011;</span><span>time position in the board of control division for the period beginning with the effective date of this act and ending June 30, 2026 for a natural resources program supervisor. It is the intent of the legislature that the state engineer's office include this full</span><span>&#x2011;</span><span>time position in its standard budget request for the immediately succeeding fiscal biennium. </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>There is appropriated one hundred fifty</span><span>&#x2011;</span><span>six thousand three hundred twenty dollars ($156,320.00) from the general fund to the state engineer's office for the period beginning with the effective date of this act and ending June 30, 2026 to be expended only for purposes of funding the position authorized in subsection (a) of this section. This appropriation shall not be transferred or expended for any other purpose and any unexpended, unobligated funds remaining from this appropriation shall revert as provided by law on June 30, 2026.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(c)</span><span>&#xa0;</span><span>&#xa0;</span><span>This section shall not be effective if 2025 House Bill 0001 or 2025 Senate File 0001 is enacted into law and authorizes the position authorized in subsection (a) of this section.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">Section 6. </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(a)</span><span>&#xa0;</span><span>&#xa0;</span><span>There is appropriated one hundred forty</span><span>&#x2011;</span><span>eight thousand dollars ($148,000.00) from the general fund to the state engineer's office for updating the technology used for the accounting system that calculates the natural flow of the North Platte River. This appropriation shall not be transferred or expended for any other purpose and any unexpended, unobligated funds remaining from this appropriation shall revert as provided by law on June 30, 2026.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>If 2025 Senate File 0001 or 2025 House Bill 0001 is enacted into law, the appropriation in subsection (a) of this section shall be reduced by one dollar ($1.00) for every one dollar ($1.00) appropriated to the state engineer's office for updating the technology used for the accounting system that calculates the natural flow of the North Platte River in 2025 Senate File 0001 or 2025 House Bill 0001.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"font-weight:bold\">[</span><span style=\"font-weight:bold; text-decoration:line-through\">Section 7.</span><span style=\"font-weight:bold; text-decoration:line-through\">&#xa0;</span><span style=\"font-weight:bold; text-decoration:line-through\">&#xa0;</span><span style=\"font-weight:bold; text-decoration:line-through\">The office of state lands and investments shall investigate opportunities to, and subject to the approval of the board of land commissioners shall, exchange public lands for private lands around the LaPrele dam and reservoir to increase public access to, and recreational activity in, the area.</span><span style=\"font-weight:bold\">]</span><span style=\"font-size:10pt; font-weight:bold\"> </span><span style=\"font-weight:bold\">[BRACKETED LANGUAGE SHOWN IN BOLD AND AS STRICKEN WAS VETOED BY GOVERNOR MARCH 4, 2025.]</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:36pt; page-break-inside:avoid; page-break-after:avoid; line-height:normal\"><span style=\"font-weight:bold\">Section 8</span><span>.</span><span>&#xa0;</span><span>&#xa0;</span><span>This act is effective immediately upon completion of all acts necessary for a bill to become law as provided by Article 4, Section 8 of the Wyoming Constitution.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center; page-break-inside:avoid; page-break-after:avoid; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center; page-break-inside:avoid; page-break-after:avoid; line-height:normal\"><span>(END)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-inside:avoid; page-break-after:avoid; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-inside:avoid; page-break-after:avoid; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><table cellspacing=\"0\" cellpadding=\"0\" style=\"border-collapse:collapse\"><tr><td style=\"width:161.1pt; border-bottom-style:solid; border-bottom-width:0.75pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:34.2pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:29.7pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:174.6pt; border-bottom-style:solid; border-bottom-width:0.75pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"width:161.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span>Speaker of the House</span></p></td><td style=\"width:34.2pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:29.7pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:174.6pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span>President of the Senate</span></p></td></tr></table><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-inside:avoid; page-break-after:avoid; line-height:normal; widows:0; orphans:0\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><table cellspacing=\"0\" cellpadding=\"0\" style=\"border-collapse:collapse\"><tr><td style=\"width:107.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:188.2pt; border-bottom-style:solid; border-bottom-width:0.75pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:115.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"width:107.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:188.2pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span>Governor</span></p></td><td style=\"width:115.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"width:107.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:188.2pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:115.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"width:107.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:188.2pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span>TIME APPROVED: _________</span></p></td><td style=\"width:115.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"width:107.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:188.2pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:115.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"width:107.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:188.2pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span>DATE APPROVED: _________</span></p></td><td style=\"width:115.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr></table><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-inside:avoid; page-break-after:avoid; line-height:normal; widows:0; orphans:0\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-inside:avoid; page-break-after:avoid; line-height:normal; widows:0; orphans:0\"><span>I hereby certify that this act originated in the House.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-inside:avoid; page-break-after:avoid; line-height:normal; widows:0; orphans:0\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-inside:avoid; page-break-after:avoid; line-height:normal; widows:0; orphans:0\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; page-break-inside:avoid; page-break-after:avoid; line-height:normal; widows:0; orphans:0\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><table cellspacing=\"0\" cellpadding=\"0\" style=\"border-collapse:collapse\"><tr><td style=\"width:161.1pt; border-bottom-style:solid; border-bottom-width:0.75pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr><tr><td style=\"width:161.1pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; page-break-inside:avoid; page-break-after:avoid; widows:0; orphans:0; font-size:12pt\"><span>Chief Clerk</span></p></td></tr></table><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><div style=\"-aw-different-first-page:true; -aw-headerfooter-type:footer-primary; clear:both\"><table cellspacing=\"0\" cellpadding=\"0\" style=\"border-collapse:collapse\"><tr><td style=\"width:148.8pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td><td style=\"width:148.8pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center; font-size:12pt\"><span style=\"-aw-field-start:true\"></span><span style=\"-aw-field-code:' PAGE '\"></span><span style=\"-aw-field-separator:true\"></span><span>1</span><span style=\"-aw-field-end:true\"></span></p></td><td style=\"width:148.8pt; padding-right:5.4pt; padding-left:5.4pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:right; font-size:12pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></td></tr></table><p style=\"margin-top:0pt; margin-bottom:0pt; line-height:normal\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></div></div></body></html>",
  "digestHTML": "<html><head><meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" /><meta http-equiv=\"Content-Style-Type\" content=\"text/css\" /><meta name=\"generator\" content=\"Aspose.Words for .NET 23.4.0\" /><title>Digest HB0117.docx</title></head><body style=\"font-family:'Courier New'; font-size:10pt\"><div><table cellspacing=\"0\" cellpadding=\"0\" style=\"border:1.5pt double #000000; -aw-border-insideh:0.5pt double #000000; border-collapse:collapse\"><tr style=\"height:19.65pt\"><td style=\"width:116.1pt; padding-right:5.4pt; padding-left:4.65pt; vertical-align:middle\"><p style=\"margin-top:0pt; margin-bottom:0pt; font-size:12pt\"><span style=\"font-weight:bold\">HB0117 </span></p></td><td style=\"width:334.6pt; padding-right:4.65pt; padding-left:5.4pt; vertical-align:middle\"><p style=\"margin-top:0pt; margin-bottom:0pt; font-size:12pt\"><span style=\"font-weight:bold\">Omnibus water bill-construction.</span></p></td></tr></table><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt\"><span>Sponsored By:</span><span style=\"width:65.99pt; text-indent:0pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:144pt\">&#xa0;</span><span>Select Water Committee</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>AN ACT relating to water development projects; authorizing construction of designated water projects; describing projects; specifying terms and conditions of funding for projects; providing grants; providing loans; providing appropriations; amending the sponsor's contingency fund; amending amounts and terms of appropriations for specified prior projects; transferring funds from water development account I to water development account II; transferring projects; repealing a project; authorizing one full‑time position; making conforming amendments; and providing for an effective date.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>1/6/2025</span><span style=\"width:28.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>Bill Number Assigned</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>1/7/2025</span><span style=\"width:28.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H Received for Introduction</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>1/24/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H Introduced and Referred to H05 - Agriculture</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/4/2025</span><span style=\"width:28.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H05 - Agriculture:Recommend Amend and Do Pass 9-0-0-0-0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative(s) Banks, Davis, Eklund, Johnson, Ottman, Provenza, Schmid, Strock, Winter</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>9</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/4/2025</span><span style=\"width:28.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>:Rerefer to H02 - Appropriations</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/6/2025</span><span style=\"width:28.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H02 - Appropriations:Recommend Do Pass 7-0-0-0-0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative(s) Allemand, Angelos, Bear, Haroldson, Pendergraft, Sherwood, Smith</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>7</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/6/2025</span><span style=\"width:28.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H Placed on General File</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117HS001/ADOPTED</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 14-after line 15</span><span style=\"width:17.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert and renumber as necessary:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"(h)</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>Project – LaPrele Irrigation District Additional Supply – 2025:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(i)</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>Project Sponsor: The state of Wyoming;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(ii)</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>Project purpose: To provide additional supply to lands served by the LaPrele Irrigation District;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(iii)</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>Project description: Investigate the feasibility of, and if feasible, design and construction of one (1) or more wells necessary to provide additional supply to lands served by the LaPrele irrigation district;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(iv)</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>Total project budget: Twenty million dollars ($20,000,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(v)</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>Appropriation: There is appropriated from the legislative stabilization reserve account to water development account I which shall be further appropriated from water development account I to the Wyoming water development office twenty million dollars ($20,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to the legislative stabilization reserve account on July 1, 2030;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(vi)</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>Special conditions:</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>The Wyoming Water Development Office shall investigate the feasibility of developing groundwater to meet the needs of water rights holders within the LaPrele Irrigation District whose rights have been affected by the required breach and replacement of the LaPrele Dam. The office shall assess whether drilling and constructing wells within the project budget is likely to significantly supplement the available water. Upon a determination by the Water Development Commission that there is a reasonable likelihood of successful development, the office shall proceed with the construction of the wells.\".</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-line 10</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>\" and insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">2029</span><span>\". </span><span style=\"text-transform:uppercase\">Winter, Chairman </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117HW001/ADOPTED</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 4-lines 15 through 22</span><span style=\"width:23.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely. </span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Pages 5 and 6</span><span style=\"width:65.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely. </span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 7-lines 1 through 18</span><span style=\"width:29.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely. </span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 7-line 20</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"(e)\" and insert \"(c)\". </span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 9-line 14</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"(f)\" and insert \"(d)\". </span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 11-line 8</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"(g)\" and insert \"(e)\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>To the extent required by this amendment: renumber as necessary. </span><span style=\"text-transform:uppercase\">Schmid </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117HW002/WITHDRAWN</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117HW003/FAILED</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>Delete the Larson, JT committee of the whole amendment (HB0117HW002/A) entirely and further amend as follows:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 1-line 8</span><span style=\"width:65.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"transferring\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 1-line 9</span><span style=\"width:65.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 1-line 10</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"development account II\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 40-line 4</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \", (d)(iv), (v) and\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 40-line 5</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Before \", 99-3-2303(b)(vi)\" delete \"(vii)\" and insert \"and (d)(vii)\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 46-lines 13 through 23</span><span style=\"width:17.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-lines 1 and 2</span><span style=\"width:17.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-line 5</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Reinsert stricken \"fifty-nine\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-line 6</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Reinsert all stricken language; delete all new language.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-line 7</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">($9,000,000.00)</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 58-lines 21 through 23</span><span style=\"width:17.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely and renumber as necessary.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-lines 1 through 3</span><span style=\"width:29.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 5</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">(C)</span><span>\" and insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">(B)</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 10</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>After \"</span><span style=\"text-decoration:underline; color:#ff0000\">subsection.</span><span>\" delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">The</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-lines 11 and 12 Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 13</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete line through \"</span><span style=\"text-decoration:underline; color:#ff0000\">subsection.</span><span>\"</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 14</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">water</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 15</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">development account III</span><span>\" and insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">the legislative stabilization reserve account</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 60-lines 9 through 15</span><span style=\"width:23.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely and renumber as necessary.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 60-line 17</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"(c)\" and insert \"(b)\". </span><span style=\"text-transform:uppercase\">Yin </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117HW004/FAILED</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 2-line 9</span><span style=\"width:65.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Before \"and 99-3-2904(f)(iv)\" insert \", 99-3-2903(f)\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 56-after line 2</span><span style=\"width:23.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"</span><span style=\"font-weight:bold\">99-3-2903.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; font-weight:bold; display:inline-block\">&#xa0;</span><span>(f)</span><span>&#xa0;</span><span>&#xa0;</span><span style=\"text-decoration:line-through; color:#0000ff\">Project Redundancy of water delivery systems </span><span style=\"text-decoration:underline; color:#ff0000\">Bitter Creek revitalization project</span><span>:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; text-align:justify\"><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: </span><span style=\"text-decoration:line-through; color:#0000ff\">Wyoming water development commission </span><span style=\"text-decoration:underline; color:#ff0000\">City of Rock Springs and Sweetwater county</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; text-align:justify\"><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: </span><span style=\"text-decoration:line-through; color:#0000ff\">Statewide municipal and rural domestic water supply </span><span style=\"text-decoration:underline; color:#ff0000\">Commencement of segment two (2) of the Bitter Creek revitalization project</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; text-align:justify\"><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: </span><span style=\"text-decoration:line-through; color:#0000ff\">Adding redundancy of domestic water delivery systems statewide </span><span style=\"text-decoration:underline; color:#ff0000\">Allow the city of Rock Springs and Sweetwater county to continue with segment two (2) of the revitalization of Bitter Creek</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:72pt; text-align:justify\"><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: six million dollars ($6,000,000.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-indent:36pt; text-align:justify\"><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriations:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; text-align:justify\"><span>(A)</span><span>&#xa0;</span><span>&#xa0;</span><span>There is appropriated from water development accounts I, II and III from monies previously obligated for projects that may be recaptured with current unobligated American Rescue Plan Act funds to the </span><span style=\"text-decoration:line-through; color:#0000ff\">commission </span><span style=\"text-decoration:underline; color:#ff0000\">city of Rock Springs and Sweetwater county</span><span> six million dollars ($6,000,000.00) or as much thereof as is necessary to carry out </span><span style=\"text-decoration:line-through; color:#0000ff\">the statewide adding of redundancy of water delivery systems </span><span style=\"text-decoration:underline; color:#ff0000\">segment two (2) of the Bitter Creek revitalization project</span><span>. </span><span style=\"text-decoration:underline; color:#ff0000\">Expenditure of this appropriation is conditioned on matching funds in the ratio of one dollar ($1.00) of appropriated funds to not less than one dollar ($1.00) of matching funds from the city of Rock Springs or Sweetwater county.</span><span> Unexpended funds appropriated under this subparagraph shall revert to water development accounts I, II and III on July 1, 2029.\". </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>Page 59-line 21</span><span style=\"width:17.99pt; display:inline-block\">&#xa0;</span><span>Delete \"and\".</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 22</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete the Larson, JT committee of the whole amendment (HB0117HW002/A) to this line; delete \"99-3-2903(f) are\" and insert \"is\". </span><span style=\"text-transform:uppercase\">Larson, JT </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117HW005/FAILED</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>Page 59-line 19</span><span style=\"width:17.99pt; display:inline-block\">&#xa0;</span><span>After \"</span><span style=\"text-decoration:underline; color:#ff0000\">subsection.</span><span>\" insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">No funds appropriated under this subsection shall be expended unless the project meets the following conditions:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">(A)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The project is owned or managed by a government entity to ensure the project maintains a continued public benefit. To the extent practicable, the project owner or manager shall seek to provide for the generation of hydroelectric power through the operation of the project;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">(B)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The reservoir is designated for public recreation including boating, swimming and fishing;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; text-align:justify\"><span style=\"text-decoration:underline; color:#ff0000\">(C)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The area surrounding the project is designated for public recreation, including the development of trails;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">(D)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">A public road is established to provide public access to the project;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:108pt; text-align:justify\"><span style=\"text-decoration:underline; color:#ff0000\">(E)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The reservoir is named Douglas recreational lake to indicate the regional significance and public benefits of the project.</span><span>\". </span><span style=\"text-transform:uppercase\">Harshman </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/10/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H COW:Passed</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117H2001/ADOPTED</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 14-after line 15</span><span style=\"width:17.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>In the House standing committee amendment (HB0117HS001/A) to this line, in subsection (h)(intro) created by that amendment, delete \"Additional\" and insert \"Supplemental\"; in paragraph (h)(ii) created by that amendment, delete \"additional\" and insert \"supplemental\"; in paragraph (h)(iii) created by that amendment, delete \"additional\" and insert \"supplemental\"; after \"district\" insert \"and other multiple uses\"; in paragraph (h)(iv) created by that amendment, delete \"Twenty million dollars ($20,000,000.00)\" and insert \"Five million dollars ($5,000,000.00)\"; in paragraph (h)(v) created by that amendment, delete \"twenty million dollars ($20,000,000.00)\" and insert \"five million dollars ($5,000,000.00)\"; in paragraph (h)(vi) created by that amendment, after \"meet\" insert \"multiple uses of the water rights holders and\". </span><span style=\"text-transform:uppercase\">Davis </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative(s) Angelos, Bear, Brady, Bratten, Brown, G, Brown, L, Byron, Campbell, E, Campbell, K, Clouston, Connolly, Davis, Eklund, Erickson, Filer, Geringer, Harshman, Heiner, Hoeft, Jarvis, Johnson, Kelly, Knapp, Larsen, Larson, Lawley, Lien, Lucas, Mccann, Neiman, Nicholas, Ottman, Pendergraft, Posey, Schmid, Sherwood, Singh, Storer, Styvar, Tarver, Thayer, Washut, Webb, Wharff, Williams, Wylie</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Nays:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative(s) Allemand, Andrew, Banks, Chestek, Guggenmos, Haroldson, Locke, Provenza, Rodriguez-Williams, Smith, Wasserburger, Webber, Winter, Yin</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Excused:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative Riggins</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Conflicts:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative Strock</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>46</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>14</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>1</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>1</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117H2002/ADOPTED</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Delete the Davis second reading amendment (HB0117H2001/A) entirely and further amend as follows:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 14-after line 15</span><span style=\"width:17.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>In the House standing committee amendment (HB0117HS001/A) to this line, in paragraph (h)(iii) after \"wells\" insert \"or other water projects\"; in paragraph (h)(v) after \"to carry out the purpose of this subsection.\" insert \"Of this appropriation, one million dollars ($1,000,000.00) is appropriated for water exploration to determine the placement of one (1) or more wells or other water projects within the LaPrele irrigation district pursuant to paragraph (iii) of this subsection and the remaining nineteen million dollars ($19,000,000.00) is appropriated as a loan for a term of thirty (30) years that shall have an interest rate of two percent (2%) interest per annum to the LaPrele irrigation district for the design and construction of one (1) or more wells or other water projects necessary to provide additional supply to lands served by the LaPrele irrigation district.\"; in paragraph (h)(vi) after \"drilling and constructing wells\" insert \"or other water projects\"; in paragraph (h)(vi) after \"construction of the wells\" insert \"or other water projects\". </span><span style=\"text-transform:uppercase\">Yin </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117H2003/ADOPTED</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 40-line 3</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>After \"(viii)(B),\" insert \"99-3-1503(g)(vi), 99-3-2003(b)(vi),\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 43-after line 14</span><span style=\"width:17.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"</span><span style=\"font-weight:bold\">99-3-1503.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects</span><span style=\"font-weight:bold; -aw-import:spaces\">&#xa0;&#xa0; </span><span style=\"font-weight:bold\">new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(g)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project</span><span style=\"-aw-import:spaces\">&#xa0;&#xa0; </span><span>Ethete Water Supply:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission two million dollars ($2,000,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"font-weight:bold\">99-3-2003.</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\">Level III construction projects</span><span style=\"font-weight:bold; -aw-import:spaces\">&#xa0;&#xa0; </span><span style=\"font-weight:bold\">new development.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(b)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project</span><span style=\"-aw-import:spaces\">&#xa0;&#xa0; </span><span>Arapahoe Pipeline and Tank:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the commission two million four hundred twenty thousand dollars ($2,420,000.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, </span><span style=\"text-decoration:line-through; color:#0000ff\">2025 </span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>;\". </span><span style=\"text-transform:uppercase\">Posey </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117H2004.01/ADOPTED</span><span style=\"width:34.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">[DIVIDED AMENDMENT]</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"width:166.5pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(CORRECTED COPY)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 17</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>After \"</span><span style=\"text-decoration:underline; color:#ff0000\">conditions:</span><span>\" insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">(A)</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-after line 19</span><span style=\"width:17.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"</span><span style=\"text-decoration:underline; color:#ff0000\">(B)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The commission and the water development office shall ensure that the new dam is constructed before the existing dam is decommissioned and ensure that the new dam will provide for a similar amount of water as the existing dam.</span><span>\". </span><span style=\"text-transform:uppercase\">Harshman </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117H2004.02/FAILED</span><span style=\"width:40.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">[DIVIDED AMENDMENT]</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"width:166.5pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(CORRECTED COPY)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 17</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>After \"</span><span style=\"text-decoration:underline; color:#ff0000\">conditions:</span><span>\" insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">(A)</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-after line 19</span><span style=\"width:17.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"</span><span style=\"text-decoration:underline; color:#ff0000\">(B)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The commission and the water development office shall:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">(II)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">Conduct a study related to the project under this subsection and report the results of the study to the select water committee not later than October 1, 2025. The study under this subdivision shall include:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:180pt; text-align:justify\"><span style=\"text-decoration:underline; color:#ff0000\">(1)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">A review of the ownership of the project including the possibility of the state or another public entity owning or operating the project, including obtaining responsibility for the liabilities of the project. The review under this subdivision shall include the possibility of changing the name of the project to the Douglas recreational lake to indicate the regional significance and public benefits of the project;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:216pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:180pt; text-align:justify\"><span style=\"text-decoration:underline; color:#ff0000\">(2)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The possibility of hydroelectric power generation through the project;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:216pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:180pt; text-align:justify\"><span style=\"text-decoration:underline; color:#ff0000\">(3)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">Recreational opportunities including boating, swimming and fishing and other possible public benefits that could be implemented during construction or operation of the project;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:180pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:180pt; text-align:justify\"><span style=\"text-decoration:underline; color:#ff0000\">(4)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">A review of the need to establish public access for recreational use of the project and the surrounding area.</span><span>\". </span><span style=\"text-transform:uppercase\">Harshman </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/11/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H 2nd Reading:Passed</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117H3001/ADOPTED</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 17</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>After \"</span><span style=\"text-decoration:underline; color:#ff0000\">conditions:</span><span>\" insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">(A)</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-after line 19</span><span style=\"width:17.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>After the Harshman second reading amendment (HB0117H2004.01/AC) to this line, insert and renumber as necessary:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"</span><span style=\"text-decoration:underline; color:#ff0000\">(C)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The commission and the water development office shall conduct a study related to the project under this subsection and report the results of the study to the select water committee not later than October 1, 2025. The study under this subdivision shall include:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:144pt; text-align:justify\"><span style=\"text-decoration:underline; color:#ff0000\">(I)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The possibility of implementing hydroelectric power generation through the project under this subsection;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:144pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:144pt; text-align:justify\"><span style=\"text-decoration:underline; color:#ff0000\">(II)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The process to obtain an easement for public access to the reservoir;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:144pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:144pt; text-align:justify\"><span style=\"text-decoration:underline; color:#ff0000\">(III)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The feasibility of recreational opportunities at the reservoir including boating, swimming and fishing and other possible public benefits;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:144pt; text-align:justify\"><span style=\"color:#ff0000; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-indent:144pt; text-align:justify\"><span style=\"text-decoration:underline; color:#ff0000\">(IV)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">The possibility of establishing increased permanent water storage options at the reservoir.</span><span>\". </span><span style=\"text-transform:uppercase\">Harshman, Strock, Yin </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117H3002/FAILED</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 17</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>After \"</span><span style=\"text-decoration:underline; color:#ff0000\">conditions:</span><span>\" insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">(A)</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-after line 19</span><span style=\"width:17.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert and renumber as necessary:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"</span><span style=\"text-decoration:underline; color:#ff0000\">(B)</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">&#xa0;</span><span style=\"text-decoration:underline; color:#ff0000\">If the project under this subsection is not owned by the state, no funds shall be expended under this appropriation and the project shall be funded through a loan as provided in this subparagraph. The state of Wyoming shall loan to the LaPrele Irrigation District from the permanent Wyoming mineral trust fund through the commission, for the design and construction of the project, an amount not to exceed ninety million dollars ($90,000,000.00) or the total actual development costs, whichever is less, for a term of fifty (50) years at an annual interest rate of four percent (4%) provided the board offers security as deemed adequate and acceptable to the attorney general. The commission shall establish a repayment schedule in accordance with the conditions prescribed in this subparagraph. Payment of interest and principal and accrual of interest on the investment loan shall be deferred until five (5) years after substantial completion of the project as determined by the commission. The investment shall be amortized over the remaining forty-five (45) years of the term. Repayments of principal and interest shall be deposited into the permanent mineral trust fund. The district shall supervise construction of the project and submit all requests for payment to the commission for approval. The commission shall, upon review and approval of the district's request, make payments directly to the district. The state treasurer shall make available to the commission, an amount not to exceed ninety million dollars ($90,000,000.00) from the permanent Wyoming mineral trust fund for the loan authorized by this subparagraph.</span><span>\". </span><span style=\"text-transform:uppercase\">Harshman </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/12/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H 3rd Reading:Passed 58-2-2-0-0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative(s) Allemand, Andrew, Angelos, Banks, Bear, Brady, Bratten, Brown, G, Brown, L, Byron, Campbell, E, Campbell, K, Chestek, Clouston, Connolly, Davis, Eklund, Erickson, Filer, Geringer, Guggenmos, Haroldson, Harshman, Heiner, Hoeft, Jarvis, Johnson, Kelly, Knapp, Larsen, Larson, Lawley, Lien, Locke, Lucas, Mccann, Neiman, Nicholas, Ottman, Pendergraft, Posey, Provenza, Rodriguez-Williams, Schmid, Sherwood, Singh, Storer, Strock, Tarver, Thayer, Washut, Webb, Webber, Wharff, Williams, Winter, Wylie, Yin</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Nays:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative(s) Styvar, Wasserburger</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Excused:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative(s) Riggins, Smith</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>58</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>2</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>2</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/13/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S Received for Introduction</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/13/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S Introduced and Referred to S05 - Agriculture</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/18/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S05 - Agriculture:Recommend Amend and Do Pass 5-0-0-0-0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) Crago, French, Ide, Mckeown, Taliaferro Pearson</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>5</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/18/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>:Rerefer to S02 - Appropriations</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/20/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S02 - Appropriations:Recommend Amend and Do Pass 4-0-1-0-0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) Gierau, Laursen, Salazar, Smith</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Excused:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator Driskill</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>4</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>1</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/20/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S Placed on General File</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117SS001/ADOPTED</span><span style=\"width:52.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(TO ENGROSSED COPY)</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 11-lines 14 through 23</span><span style=\"width:17.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely and renumber as necessary.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 12</span><span style=\"width:101.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 13-lines 1 through 18</span><span style=\"width:23.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-line 21</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">2029</span><span>\" and insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 60-line 6</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">(A)</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 60-lines 10 through 20</span><span style=\"width:17.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 61-lines 1 through 13</span><span style=\"width:23.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely. </span><span style=\"text-transform:uppercase\">French, Chairman </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117SS002/ADOPTED</span><span style=\"width:52.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(TO ENGROSSED COPY)</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 1-line 8</span><span style=\"width:65.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"transferring\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 1-line 9</span><span style=\"width:65.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 1-line 10</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"development account II;\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 39-line 8</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \", (d)(iv), (v) and (vii)\" and insert \"and (d)(vii)\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-lines 1 through 13</span><span style=\"width:23.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-line 16</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Reinsert stricken \"fifty-nine\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-line 17</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Reinsert all stricken language; delete all new language.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-line 18</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">($9,000,000.00)</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-line 21</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete the Senate standing committee amendment (HB0117SS001/AE) to this line.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-lines 7 through 12</span><span style=\"width:23.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely and renumber as necessary.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 14</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">(C)</span><span>\" and insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">(B)</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 19</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>After \"</span><span style=\"text-decoration:underline; color:#ff0000\">subsection.</span><span>\" delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">The</span><span>\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-lines 20 and 21 Delete entirely.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 59-line 22</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete line through \"</span><span style=\"text-decoration:underline; color:#ff0000\">subsection.</span><span>\"</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 62-lines 4 through 10</span><span style=\"width:23.97pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete entirely and renumber as necessary.</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 60-line 12</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"(c)\" and insert \"(b)\". </span><span style=\"text-transform:uppercase\">Salazar, Chairman </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/24/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S COW:Passed</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117S2001/FAILED</span><span style=\"width:58.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(TO ENGROSSED COPY)</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 4-after line 13</span><span style=\"width:23.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert and renumber as necessary:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"(c)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Cloud Seeding: Wind River and Sierra Madre mountain ranges 2026 (ground</span><span>&#x2011;</span><span>based):</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: The state of Wyoming;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: To enhance the winter snowpack in the Wind River and Sierra Madre mountain ranges;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Conduct a ground</span><span>&#x2011;</span><span>based operational winter snowpack augmentation program during the 2025</span><span>&#x2011;</span><span>2026 season;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Eight hundred sixty</span><span>&#x2011;</span><span>two thousand one hundred forty</span><span>&#x2011;</span><span>three dollars ($862,143.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Appropriation: There is appropriated from water development account I to the Wyoming water development office three hundred twenty</span><span>&#x2011;</span><span>two thousand one hundred forty</span><span>&#x2011;</span><span>three dollars ($322,143.00) or as much thereof as is necessary to carry out the purpose of this subsection. Unexpended funds appropriated under this subsection shall revert to water development account I on July 1, 2027;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(vi)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(A)</span><span>&#xa0;</span><span>&#xa0;</span><span>The state of Wyoming shall participate at a rate up to thirty</span><span>&#x2011;</span><span>seven percent (37%) of actual project operations costs not to exceed three hundred twenty</span><span>&#x2011;</span><span>two thousand one hundred forty</span><span>&#x2011;</span><span>three dollars ($322,143.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(B)</span><span>&#xa0;</span><span>&#xa0;</span><span>Prior to commencing project operations, the Wyoming water development office shall acquire funding commitments from other Colorado River basin water users or other interested parties for a minimum of sixty</span><span>&#x2011;</span><span>three percent (63%) of actual project operations costs;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(C)</span><span>&#xa0;</span><span>&#xa0;</span><span>If the project is cancelled, the Wyoming water development office is authorized to use the appropriated funds under this subsection to remove weather modification equipment and reclaim project sites.\". </span><span style=\"text-transform:uppercase\">Laursen, D </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) Anderson, Barlow, Case, Cooper, Crago, Dockstader, Gierau, Jones, Kolb, Landen, Laursen, Nethercott, Olsen, Rothfuss, Schuler</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Nays:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) Biteman, Boner, Brennan, Crum, Driskill, French, Hicks, Hutchings, Ide, Mckeown, Pappas, Pearson, Salazar, Scott, Smith, Steinmetz</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>15</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>16</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117S2002/ADOPTED</span><span style=\"width:52.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(TO ENGROSSED COPY)</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 47-line 21</span><span style=\"width:53.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete the first Senate standing committee amendment (HB0117SS001/AE) and the second Senate standing committee amendment (HB0117SS002/AE) to this line; delete \"</span><span style=\"text-decoration:underline; color:#ff0000\">2029</span><span>\" and insert \"</span><span style=\"text-decoration:underline; color:#ff0000\">2026</span><span>\". </span><span style=\"text-transform:uppercase\">Steinmetz </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/25/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S 2nd Reading:Passed</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/26/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S 3rd Reading:Laid Back</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/27/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S 3rd Reading:Laid Back</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117S3001/ADOPTED</span><span style=\"width:52.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(TO ENGROSSED COPY)</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 4-after line 13</span><span style=\"width:23.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert and renumber as necessary:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"(c)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project – Cloud Seeding: Wind River and Sierra Madre mountain ranges 2026 (ground</span><span>&#x2011;</span><span>based):</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(i)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project sponsor: The state of Wyoming;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(ii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project purpose: To enhance the winter snowpack in the Wind River and Sierra Madre mountain ranges;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(iii)</span><span>&#xa0;</span><span>&#xa0;</span><span>Project description: Conduct a ground</span><span>&#x2011;</span><span>based operational winter snowpack augmentation program during the 2025</span><span>&#x2011;</span><span>2026 season;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(iv)</span><span>&#xa0;</span><span>&#xa0;</span><span>Total project budget: Eight hundred sixty</span><span>&#x2011;</span><span>two thousand one hundred forty</span><span>&#x2011;</span><span>three dollars ($862,143.00);</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(v)</span><span>&#xa0;</span><span>&#xa0;</span><span>Special conditions: Prior to commencing project operations, the Wyoming water development office shall acquire funding commitments from other Colorado River basin water users or other interested parties for a minimum of one hundred percent (100%) of actual project operations costs.\". </span><span style=\"text-transform:uppercase\">Jones, Laursen, D </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117S3002/WITHDRAWN</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117S3003/ADOPTED</span><span style=\"width:52.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(TO ENGROSSED COPY)</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 1-line 11</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>After \"project;\" insert \"authorizing one full-time position;\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 63-after line 7</span><span style=\"width:23.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert and renumber as necessary:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"</span><span style=\"font-weight:bold\">Section 5.</span><span> </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(a) The state engineer's office is authorized up to one (1) full-time position in the board of control division for the period beginning with the effective date of this act and ending June 30, 2026 for a natural resources program supervisor. It is the intent of the legislature that the state engineer's office include this full-time position in its standard budget request for the immediately succeeding fiscal biennium. </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(b) There is appropriated one hundred fifty-six thousand three hundred twenty dollars ($156,320.00) from the general fund to the state engineer's office for the period beginning with the effective date of this act and ending June 30, 2026 to be expended only for purposes of funding the position authorized in subsection (a) of this section. This appropriation shall not be transferred or expended for any other purpose and any unexpended, unobligated funds remaining from this appropriation shall revert as provided by law on June 30, 2026.\".</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(c)</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>This section shall not be effective if 2025 House Bill 0001 or 2025 Senate File 0001 is enacted into law and authorizes the position authorized in subsection (a) of this section.\".</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>Page 63-line 9</span><span style=\"width:23.99pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"font-weight:bold\">Section 5.</span><span>\" and insert \"</span><span style=\"font-weight:bold\">Section 6.</span><span>\". </span><span style=\"text-transform:uppercase\">Jones </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) Anderson, Barlow, Biteman, Boner, Brennan, Case, Cooper, Crago, Crum, Dockstader, Driskill, Gierau, Hicks, Hutchings, Jones, Kolb, Landen, Nethercott, Olsen, Pappas, Pearson, Rothfuss, Salazar, Schuler, Scott, Steinmetz</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Nays:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) French, Ide, Laursen, Mckeown, Smith</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>26</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>5</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117S3004/FAILED</span><span style=\"width:58.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(TO ENGROSSED COPY)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"width:166.5pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(CORRECTED COPY)</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 63-after line 7</span><span style=\"width:23.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert and renumber as necessary:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">\"Section 5. </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(a) Notwithstanding W.S. 9-2-1008 and 9-4-207, of unexpended, unobligated monies in the state shooting complex account created by 2023 Wyoming session laws, chapter 146, section 3, up to ten million dollars ($10,000,000.00) or as much thereof as is available, and an additional three million dollars ($3,000,000.00) from the Wyoming tourism reserve and projects account are appropriated to the department of state parks and cultural resources for the development, siting and construction of water resources and other facilities for the Wyoming state shooting complex. Notwithstanding W.S. 9-2-1008 and 9-4-207, any unexpended, unobligated funds from these appropriations shall not revert and are authorized to be expended for the operation and maintenance of the Wyoming state shooting complex. These appropriations shall not be transferred or expended for any other purpose.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(b) If 2025 Senate File 0001 or 2025 House Bill 0001 is enacted into law, the appropriations in subsection (a) of this section shall be reduced by one dollar ($1.00) for every one dollar ($1.00) appropriated to the department of state parks and cultural resources for the Wyoming state shooting complex in 2025 Senate File 0001 or 2025 House Bill 0001.\".</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span>Page 63-line 9</span><span style=\"width:23.99pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"font-weight:bold\">Section 5.</span><span>\" and insert \"</span><span style=\"font-weight:bold\">Section 6.</span><span>\" </span><span style=\"text-transform:uppercase\">Hicks </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) Barlow, Boner, Brennan, Cooper, Crago, Hicks, Jones, Kolb, Landen, Laursen, Pappas, Pearson, Schuler, Smith, Steinmetz</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Nays:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) Anderson, Biteman, Case, Crum, Dockstader, Driskill, French, Gierau, Hutchings, Ide, Mckeown, Nethercott, Olsen, Rothfuss, Salazar, Scott</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>15</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>16</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117S3005/ADOPTED</span><span style=\"width:52.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(TO ENGROSSED COPY)</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 63-after line 7</span><span style=\"width:23.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert and renumber as necessary:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">\"Section 5. </span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(a) There is appropriated one hundred forty-eight thousand dollars ($148,000.00) from the general fund to the state engineer's office for updating the technology used for the accounting system that calculates the natural flow of the North Platte River. This appropriation shall not be transferred or expended for any other purpose and any unexpended, unobligated funds remaining from this appropriation shall revert as provided by law on June 30, 2026.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>(b) If 2025 Senate File 0001 or 2025 House Bill 0001 is enacted into law, the appropriation in subsection (a) of this section shall be reduced by one dollar ($1.00) for every one dollar ($1.00) appropriated to the state engineer's office for updating the technology used for the accounting system that calculates the natural flow of the North Platte River in 2025 Senate File 0001 or 2025 House Bill 0001.\".</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 63-line 9</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"font-weight:bold\">Section 5.</span><span>\" and insert \"</span><span style=\"font-weight:bold\">Section 6.</span><span>\" </span><span style=\"text-transform:uppercase\">Nethercott </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) Anderson, Barlow, Biteman, Boner, Brennan, Case, Cooper, Crago, Crum, Dockstader, Driskill, Gierau, Jones, Landen, Nethercott, Olsen, Pappas, Rothfuss, Salazar, Schuler, Scott, Smith</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Nays:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) French, Hicks, Hutchings, Ide, Kolb, Laursen, Mckeown, Pearson, Steinmetz</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>22</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>9</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">HB0117S3006/ADOPTED</span><span style=\"width:52.48pt; font-weight:bold; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:166.5pt\">&#xa0;</span><span style=\"font-weight:bold\">(TO ENGROSSED COPY)</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 63-after line 7</span><span style=\"width:23.98pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Insert and renumber as necessary:</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"width:36pt; display:inline-block\">&#xa0;</span><span>\"</span><span style=\"font-weight:bold\">Section 5.</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>The office of state lands and investments shall investigate opportunities to, and subject to the approval of the board of land commissioners shall, exchange public lands for private lands around the LaPrele dam and reservoir to increase public access to, and recreational activity in, the area.\".</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:144pt; margin-bottom:0pt; text-indent:-144pt; text-align:justify\"><span>Page 63-line 9</span><span style=\"width:59.99pt; text-indent:0pt; display:inline-block\">&#xa0;</span><span>Delete \"</span><span style=\"font-weight:bold\">Section 5.</span><span>\" and insert \"</span><span style=\"font-weight:bold\">Section 6.</span><span>\".</span><span style=\"-aw-import:spaces\">&#xa0; </span><span style=\"text-transform:uppercase\">Driskill </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/28/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S 3rd Reading:Passed 29-2-0-0-0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) Anderson, Barlow, Biteman, Boner, Brennan, Case, Cooper, Crago, Crum, Dockstader, Driskill, French, Gierau, Hicks, Ide, Jones, Landen, Laursen, Mckeown, Nethercott, Olsen, Pappas, Pearson, Rothfuss, Salazar, Schuler, Scott, Smith, Steinmetz</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Nays:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Senator(s) Hutchings, Kolb</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>29</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>2</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/28/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H Received for Concurrence</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/28/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H Concur:Passed 34-26-2-0-0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:center\"><span style=\"font-weight:bold\">ROLL CALL</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Ayes:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative(s) Andrew, Banks, Brown, L, Byron, Campbell, E, Campbell, K, Chestek, Clouston, Connolly, Davis, Eklund, Erickson, Filer, Geringer, Haroldson, Harshman, Heiner, Hoeft, Jarvis, Larsen, Larson, Lawley, Ottman, Posey, Provenza, Riggins, Sherwood, Smith, Storer, Strock, Thayer, Williams, Wylie, Yin</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Nays:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative(s) Allemand, Angelos, Bear, Brady, Bratten, Brown, G, Guggenmos, Johnson, Kelly, Knapp, Lien, Locke, Lucas, Mccann, Neiman, Pendergraft, Rodriguez-Williams, Schmid, Singh, Styvar, Tarver, Washut, Wasserburger, Webb, Webber, Wharff</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-weight:bold\">Excused:</span><span style=\"font-weight:bold\">&#xa0;</span><span style=\"font-weight:bold\"> </span><span>Representative(s) Nicholas, Winter</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-weight:bold\">Ayes </span><span>34</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Nays </span><span>26</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Excused </span><span>2</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Absent </span><span>0</span><span>&#xa0;</span><span>&#xa0;</span><span>&#xa0;</span><span> </span><span style=\"font-weight:bold\">Conflicts </span><span>0</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/28/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>Assigned Number HEA No. 0056</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/28/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>H Speaker Signed HEA No. 0056</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>2/28/2025</span><span style=\"width:22.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>S President Signed HEA No. 0056</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>3/4/2025</span><span style=\"width:28.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>Governor Signed HEA No. 0056 </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>3/4/2025</span><span style=\"width:28.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>Veto Message Received</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>3/4/2025</span><span style=\"width:28.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>Governor Line-Item Vetoed HEA No. 0056 </span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>3/4/2025</span><span style=\"width:28.49pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:76.5pt\">&#xa0;</span><span>Assigned Chapter Number 111</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span>Chapter No. 111</span><span style=\"-aw-import:spaces\">&#xa0; </span><span>Session Laws of Wyoming 2025</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></div></body></html>",
  "summaryHTML": "<html><head><meta http-equiv=\"Content-Type\" content=\"text/html; charset=utf-8\" /><meta http-equiv=\"Content-Style-Type\" content=\"text/css\" /><meta name=\"generator\" content=\"Aspose.Words for .NET 23.4.0\" /><title>Bill Summary - 25LSO-0452</title></head><body style=\"font-family:'Courier New'; font-size:12pt\"><div><div style=\"-aw-headerfooter-type:header-primary; clear:both\"><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></div><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Bill No.:</span><span style=\"width:65.33pt; font-family:'Times New Roman'; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:108pt\">&#xa0;</span><span style=\"font-family:'Times New Roman'\">HB0117</span><span style=\"width:103.33pt; font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:252pt\">&#xa0;</span><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Effective:</span><span style=\"width:22.7pt; font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; display:inline-block\">&#xa0;</span><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Immediately</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">LSO No.:</span><span style=\"width:59.33pt; font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:108pt\">&#xa0;</span><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">25LSO-0452</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Enrolled Act No.:</span><span style=\"width:17.68pt; font-family:'Times New Roman'; letter-spacing:-0.15pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:108pt\">&#xa0;</span><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt\">HEA No. 0056</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Chapter No.:</span><span style=\"width:40.68pt; font-family:'Times New Roman'; letter-spacing:-0.15pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:108pt\">&#xa0;</span><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt\">111</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Prime Sponsor:</span><span style=\"width:27.67pt; font-family:'Times New Roman'; letter-spacing:-0.15pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:108pt\">&#xa0;</span><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt\">Select Water Committee</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:108pt; margin-bottom:0pt; text-indent:-108pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Catch Title:</span><span style=\"width:46.35pt; text-indent:0pt; font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:108pt\">&#xa0;</span><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Omnibus water bill-construction.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Has Report:</span><span style=\"width:45.01pt; font-family:'Times New Roman'; letter-spacing:-0.15pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:108pt\">&#xa0;</span><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt\">No</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-left:108pt; margin-bottom:0pt; text-indent:-108pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Subject: </span><span style=\"width:62.34pt; text-indent:0pt; font-family:'Times New Roman'; letter-spacing:-0.15pt; display:inline-block; -aw-tabstop-align:left; -aw-tabstop-pos:108pt\">&#xa0;</span><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt\">Provides authorization and funding for water development program projects.</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Summary/Major Elements:</span></p><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"disc\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:28.52pt; text-align:justify; padding-left:7.48pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Symbol'; -aw-font-weight:normal; -aw-number-format:''\"><span style=\"font-family:'Times New Roman'; font-weight:bold\">2025 Construction Projects</span></li></ul><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"circle\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Big Horn Regional JPB South Transmission Project 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Cloud Seeding: Wind River and Sierra Madre mountain ranges 2026 (ground‑based)</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Hoback Junction Public Water System 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">SAWS JPB Upper Road Transmission Main Phase I 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Small Water Development Projects – New Development 2025</span></li></ul><p style=\"margin-top:0pt; margin-left:78.75pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"disc\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:28.52pt; text-align:justify; padding-left:7.48pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Symbol'; -aw-font-weight:normal; -aw-number-format:''\"><span style=\"font-family:'Times New Roman'; font-weight:bold\">2025 Rehabilitation Projects</span></li></ul><p style=\"margin-top:0pt; margin-left:42.75pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"circle\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">CAID Lateral 256 Check Structure Rehabilitation 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Casper Tank Replacement 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Cottonwood Irrigation District Pipeline Replacement 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">EVIDD Farson Lateral Phase 4A 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">GID 62.2 Check Structure Project 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Kirby Creek Spillway Replacement 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Meeteetse Trails Estates 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Rawlins Sage Creek Pipeline 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Sidon ID Canal Crossing 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Small Water Development Projects – Rehabilitation 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Upper Bluff Pump Plant No. 1 Pipeline 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">West Afton ID Phase I Project 2025</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Willwood ID Willwood Chute 2025</span></li></ul><p style=\"margin-top:0pt; margin-left:78.75pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"disc\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:28.52pt; text-align:justify; padding-left:7.48pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Symbol'; -aw-font-weight:normal; -aw-number-format:''\"><span style=\"font-family:'Times New Roman'; font-weight:bold\">Amendments to Prior Projects</span></li></ul><p style=\"margin-top:0pt; margin-left:42.75pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"circle\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Aladdin Water Supply Project</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Sponsor's Contingency Fund</span><span style=\"font-family:'Times New Roman'\">&#x2011;</span><span style=\"font-family:'Times New Roman'\">Rehabilitation</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Ethete Water Supply</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Arapahoe Pipeline and Tank</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Broken Wheel Ranch Water Supply 2017</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Gillette Regional Extensions 2017</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Middle Piney Reservoir</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Alkali Creek Reservoir</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Gillette Regional Extensions Phase IV 2018</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Project GR/RS/SC JPWB Pump Station 2019</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Eden Valley Irrigation District System Improvements 2019</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Gillette Regional Extensions Phase V 2020</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Enterprise Watershed Improvement District Canal Lining 2020</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Laramie Valley Diversion Structure 2020</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Lander Well and Transmission Pipeline 2021</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">South End Water Users ISD Pipeline 2023</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">Goshen Irrigation District Tunnels 1 and 2 Rehabilitation</span></li><li style=\"margin-left:48.2pt; text-align:justify; padding-left:5.8pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Courier New'; -aw-font-weight:normal; -aw-number-format:'o'\"><span style=\"font-family:'Times New Roman'\">LaPrele Dam Rehabilitation</span></li></ul><p style=\"margin-top:0pt; margin-left:78.75pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"disc\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:28.52pt; text-align:justify; padding-left:7.48pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Symbol'; -aw-font-weight:normal; -aw-number-format:''\"><span style=\"font-family:'Times New Roman'\">Repeals a redundancy of water delivery systems project.</span></li></ul><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"disc\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:28.52pt; text-align:justify; padding-left:7.48pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Symbol'; -aw-font-weight:normal; -aw-number-format:''\"><span style=\"font-family:'Times New Roman'\">Provides for the transfer of state owned wells.</span></li></ul><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"disc\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:28.52pt; text-align:justify; padding-left:7.48pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Symbol'; -aw-font-weight:normal; -aw-number-format:''\"><span style=\"font-family:'Times New Roman'\">Authorizes the transfer of funds from water development account I to water development account II.</span></li></ul><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"disc\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:28.52pt; text-align:justify; padding-left:7.48pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Symbol'; -aw-font-weight:normal; -aw-number-format:''\"><span style=\"font-family:'Times New Roman'\">Authorizes and provides an appropriation to the State Engineers Office for a natural resources program supervisor.</span></li></ul><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"disc\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:28.52pt; text-align:justify; padding-left:7.48pt; font-family:serif; letter-spacing:-0.15pt; -aw-font-family:'Symbol'; -aw-font-weight:normal; -aw-number-format:''\"><span style=\"font-family:'Times New Roman'\">Provides an appropriation for funds to update the system calculating the natural flow of the North Platte River.</span></li></ul><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify; font-size:13pt\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt\">Comments:</span></p><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; font-weight:bold; letter-spacing:-0.15pt; -aw-import:ignore\">&#xa0;</span></p><ul type=\"disc\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:28.52pt; text-align:justify; padding-left:7.48pt; font-family:serif; -aw-font-family:'Symbol'; -aw-font-weight:normal; -aw-number-format:''\"><span style=\"font-family:'Times New Roman'; letter-spacing:-0.15pt\">See</span><span style=\"font-family:'Times New Roman'\"> the companion bill, Senate File 0082, Omnibus water bill-planning.</span></li></ul><p style=\"margin-top:0pt; margin-left:36pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; -aw-import:ignore\">&#xa0;</span></p><ul type=\"disc\" style=\"margin:0pt; padding-left:0pt\"><li style=\"margin-left:28.52pt; text-align:justify; padding-left:7.48pt; font-family:serif; -aw-font-family:'Symbol'; -aw-font-weight:normal; -aw-number-format:''\"><span style=\"font-family:'Times New Roman'\">The Governor exercised line‑item vetoes in this act.</span><span style=\"font-family:'Times New Roman'; -aw-import:spaces\">&#xa0; </span><span style=\"font-family:'Times New Roman'\">Originally, the enrolled act required the Office of State Lands and Investments to investigate land exchanges to acquire state lands around LaPrele dam and reservoir.</span></li></ul><p style=\"margin-top:0pt; margin-bottom:0pt; text-align:justify\"><span style=\"font-family:'Times New Roman'; -aw-import:ignore\">&#xa0;</span></p><div style=\"-aw-headerfooter-type:footer-primary; clear:both\"><table cellspacing=\"0\" cellpadding=\"0\" style=\"border:0.75pt solid #000000; -aw-border:0.5pt single; -aw-border-insideh:0.5pt single #000000; -aw-border-insidev:0.5pt single #000000; border-collapse:collapse\"><tr style=\"height:43.1pt\"><td style=\"width:459.75pt; padding-right:5.03pt; padding-left:5.03pt; vertical-align:top\"><p style=\"margin-top:0pt; margin-bottom:0pt; font-size:11pt\"><span style=\"font-family:'Times New Roman'\">The above summary is not an official publication of the Wyoming Legislature and is not an official statement of legislative intent.</span><span style=\"font-family:'Times New Roman'; -aw-import:spaces\">&#xa0; </span><span style=\"font-family:'Times New Roman'\">While the Legislative Service Office endeavored to provide accurate information in this summary, it should not be relied upon as a comprehensive abstract of the bill.</span></p></td></tr></table><p style=\"margin-top:0pt; margin-bottom:0pt\"><span style=\"-aw-import:ignore\">&#xa0;</span></p></div></div></body></html>",
  "year": 2025,
  "showPDF": false,
  "isEngrossed": false,
  "specialSessionValue": null,
  "scheduledActions": [],
  "rollCalls": [
    {
      "year": 2025,
      "voteID": -420,
      "chamber": "H",
      "voteDate": "2025-02-04T18:48:31",
      "yesVotesCount": 9,
      "yesVotes": "BANKS, DAVIS, EKLUND, JOHNSON, OTTMAN, PROVENZA, SCHMID, STROCK, WINTER",
      "noVotesCount": 0,
      "noVotes": "",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 0,
      "excusedVotes": "",
      "voteType": "C",
      "billNumber": "HB0117",
      "action": "H05 - Agriculture:Recommend Amend and Do Pass 9-0-0-0-0",
      "amendmentNumber": null,
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": -466,
      "chamber": "H",
      "voteDate": "2025-02-06T19:15:42",
      "yesVotesCount": 7,
      "yesVotes": "ALLEMAND, ANGELOS, HAROLDSON, PENDERGRAFT, SHERWOOD, SMITH, BEAR",
      "noVotesCount": 0,
      "noVotes": "",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 0,
      "excusedVotes": "",
      "voteType": "C",
      "billNumber": "HB0117",
      "action": "H02 - Appropriations:Recommend Do Pass 7-0-0-0-0",
      "amendmentNumber": null,
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": 1241,
      "chamber": "H",
      "voteDate": "2025-02-11T11:27:42",
      "yesVotesCount": 46,
      "yesVotes": "Angelos, Bear, Brady, Bratten, Brown, G, Brown, L, Byron, Campbell, E, Campbell, K, Clouston, Davis, Connolly, Eklund, Erickson, Filer, Geringer, Harshman, Heiner, Hoeft, Jarvis, Johnson, Kelly, Knapp, Larsen, Larson, Lawley, Lien, Lucas, McCann, Nicholas, Ottman, Posey, Pendergraft, Schmid, Sherwood, Singh, Storer, Styvar, Tarver, Thayer, Washut, Webb, Wharff, Williams, Wylie, Neiman",
      "noVotesCount": 14,
      "noVotes": "Allemand, Andrew, Banks, Chestek, Guggenmos, Haroldson, Locke, Provenza, Rodriguez-Williams, Smith, Wasserburger, Webber, Winter, Yin",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 1,
      "conflictVotes": "Strock",
      "excusedVotesCount": 1,
      "excusedVotes": "Riggins",
      "voteType": "F",
      "billNumber": "HB0117",
      "action": "Amendment adopted 46-14-1-0-1",
      "amendmentNumber": "HB0117H2001",
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": 1262,
      "chamber": "H",
      "voteDate": "2025-02-12T11:41:36",
      "yesVotesCount": 58,
      "yesVotes": "Allemand, Andrew, Angelos, Banks, Bear, Brady, Bratten, Brown, G, Brown, L, Byron, Campbell, E, Campbell, K, Chestek, Clouston, Connolly, Davis, Eklund, Erickson, Filer, Geringer, Guggenmos, Haroldson, Harshman, Heiner, Hoeft, Jarvis, Johnson, Kelly, Knapp, Larsen, Larson, Lawley, Lien, Locke, Lucas, McCann, Nicholas, Ottman, Pendergraft, Posey, Provenza, Rodriguez-Williams, Sherwood, Schmid, Singh, Storer, Strock, Tarver, Thayer, Washut, Webb, Webber, Wharff, Winter, Williams, Wylie, Yin, Neiman",
      "noVotesCount": 2,
      "noVotes": "Styvar, Wasserburger",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 2,
      "excusedVotes": "Riggins, Smith",
      "voteType": "F",
      "billNumber": "HB0117",
      "action": "H 3rd Reading:Passed 58-2-2-0-0",
      "amendmentNumber": null,
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": -618,
      "chamber": "S",
      "voteDate": "2025-02-18T14:19:10",
      "yesVotesCount": 5,
      "yesVotes": "CRAGO, IDE, MCKEOWN, TALIAFERRO PEARSON, FRENCH",
      "noVotesCount": 0,
      "noVotes": "",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 0,
      "excusedVotes": "",
      "voteType": "C",
      "billNumber": "HB0117",
      "action": "S05 - Agriculture:Recommend Amend and Do Pass 5-0-0-0-0",
      "amendmentNumber": null,
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": -677,
      "chamber": "S",
      "voteDate": "2025-02-20T16:31:10",
      "yesVotesCount": 4,
      "yesVotes": "GIERAU, LAURSEN, SMITH, SALAZAR",
      "noVotesCount": 0,
      "noVotes": "",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 1,
      "excusedVotes": "DRISKILL",
      "voteType": "C",
      "billNumber": "HB0117",
      "action": "S02 - Appropriations:Recommend Amend and Do Pass 4-0-1-0-0",
      "amendmentNumber": null,
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": 474,
      "chamber": "S",
      "voteDate": "2025-02-25T11:32:19",
      "yesVotesCount": 15,
      "yesVotes": "Anderson, Barlow, Cooper, Case, Crago, Dockstader, Gierau, Jones, Kolb, Landen, Laursen, Nethercott, Olsen, Rothfuss, Schuler",
      "noVotesCount": 16,
      "noVotes": "Boner, Brennan, Crum, Driskill, French, Hicks, Hutchings, Ide, McKeown, Pappas, Pearson, Salazar, Scott, Smith, Steinmetz, Biteman",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 0,
      "excusedVotes": "",
      "voteType": "F",
      "billNumber": "HB0117",
      "action": "Amendment failed 15-16-0-0-0",
      "amendmentNumber": "HB0117S2001",
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": 530,
      "chamber": "S",
      "voteDate": "2025-02-28T11:01:22",
      "yesVotesCount": 26,
      "yesVotes": "Anderson, Barlow, Boner, Brennan, Case, Cooper, Crago, Crum, Dockstader, Driskill, Gierau, Hicks, Hutchings, Jones, Kolb, Landen, Nethercott, Olsen, Pappas, Pearson, Rothfuss, Salazar, Schuler, Scott, Steinmetz, Biteman",
      "noVotesCount": 5,
      "noVotes": "French, Ide, Laursen, McKeown, Smith",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 0,
      "excusedVotes": "",
      "voteType": "F",
      "billNumber": "HB0117",
      "action": "Amendment adopted 26-5-0-0-0",
      "amendmentNumber": "HB0117S3003",
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": 531,
      "chamber": "S",
      "voteDate": "2025-02-28T11:23:04",
      "yesVotesCount": 15,
      "yesVotes": "Barlow, Boner, Brennan, Cooper, Crago, Hicks, Jones, Kolb, Landen, Laursen, Pappas, Pearson, Schuler, Smith, Steinmetz",
      "noVotesCount": 16,
      "noVotes": "Anderson, Case, Dockstader, Crum, Driskill, French, Gierau, Hutchings, Ide, McKeown, Nethercott, Olsen, Rothfuss, Salazar, Scott, Biteman",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 0,
      "excusedVotes": "",
      "voteType": "F",
      "billNumber": "HB0117",
      "action": "Amendment failed 15-16-0-0-0",
      "amendmentNumber": "HB0117S3004",
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": 532,
      "chamber": "S",
      "voteDate": "2025-02-28T11:27:00",
      "yesVotesCount": 22,
      "yesVotes": "Anderson, Barlow, Boner, Brennan, Case, Cooper, Crum, Crago, Dockstader, Driskill, Gierau, Jones, Landen, Nethercott, Olsen, Pappas, Rothfuss, Salazar, Schuler, Scott, Smith, Biteman",
      "noVotesCount": 9,
      "noVotes": "French, Hicks, Hutchings, Kolb, Ide, Laursen, McKeown, Pearson, Steinmetz",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 0,
      "excusedVotes": "",
      "voteType": "F",
      "billNumber": "HB0117",
      "action": "Amendment adopted 22-9-0-0-0",
      "amendmentNumber": "HB0117S3005",
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": 533,
      "chamber": "S",
      "voteDate": "2025-02-28T11:41:18",
      "yesVotesCount": 29,
      "yesVotes": "Anderson, Barlow, Boner, Brennan, Case, Cooper, Crago, Crum, Dockstader, Driskill, French, Gierau, Hicks, Ide, Jones, Landen, Laursen, McKeown, Nethercott, Olsen, Pearson, Pappas, Rothfuss, Salazar, Schuler, Scott, Smith, Steinmetz, Biteman",
      "noVotesCount": 2,
      "noVotes": "Hutchings, Kolb",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 0,
      "excusedVotes": "",
      "voteType": "F",
      "billNumber": "HB0117",
      "action": "S 3rd Reading:Passed 29-2-0-0-0",
      "amendmentNumber": null,
      "rollCallLegVoteDtos": null
    },
    {
      "year": 2025,
      "voteID": 1433,
      "chamber": "H",
      "voteDate": "2025-02-28T16:41:48",
      "yesVotesCount": 34,
      "yesVotes": "Andrew, Banks, Brown, L, Byron, Campbell, E, Campbell, K, Chestek, Clouston, Connolly, Davis, Eklund, Filer, Geringer, Erickson, Haroldson, Harshman, Heiner, Hoeft, Jarvis, Larsen, Larson, Lawley, Ottman, Posey, Provenza, Riggins, Sherwood, Storer, Smith, Strock, Thayer, Williams, Wylie, Yin",
      "noVotesCount": 26,
      "noVotes": "Allemand, Angelos, Bear, Brady, Bratten, Brown, G, Guggenmos, Johnson, Kelly, Knapp, Lien, Locke, Lucas, McCann, Pendergraft, Rodriguez-Williams, Schmid, Singh, Styvar, Tarver, Washut, Wasserburger, Webb, Webber, Wharff, Neiman",
      "absentVotesCount": 0,
      "absentVotes": "",
      "conflictVotesCount": 0,
      "conflictVotes": "",
      "excusedVotesCount": 2,
      "excusedVotes": "Nicholas, Winter",
      "voteType": "F",
      "billNumber": "HB0117",
      "action": "H Concur:Passed 34-26-2-0-0",
      "amendmentNumber": null,
      "rollCallLegVoteDtos": null
    }
  ],
  "amendments": [
    {
      "amendmentNumber": "HB0117H2001",
      "house": "H",
      "order": "2nd reading",
      "sequence": "001",
      "status": "Adopted",
      "sponsor": "Representative Davis",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117H2002",
      "house": "H",
      "order": "2nd reading",
      "sequence": "002",
      "status": "Adopted",
      "sponsor": "Representative Yin",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117H2003",
      "house": "H",
      "order": "2nd reading",
      "sequence": "003",
      "status": "Adopted",
      "sponsor": "Representative Posey",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117H2004",
      "house": "H",
      "order": "2nd reading",
      "sequence": "004",
      "status": "Divided",
      "sponsor": "Representative Harshman",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117H2004.01",
      "house": "H",
      "order": "2nd reading",
      "sequence": "004",
      "status": "Corrected, Adopted",
      "sponsor": "Representative Harshman",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117H2004.02",
      "house": "H",
      "order": "2nd reading",
      "sequence": "004",
      "status": "Corrected, Failed",
      "sponsor": "Representative Harshman",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117H3001",
      "house": "H",
      "order": "3rd reading",
      "sequence": "001",
      "status": "Adopted",
      "sponsor": "Representative Harshman",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117H3002",
      "house": "H",
      "order": "3rd reading",
      "sequence": "002",
      "status": "Failed",
      "sponsor": "Representative Harshman",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117HS001",
      "house": "H",
      "order": "Standing Committee",
      "sequence": "001",
      "status": "Adopted",
      "sponsor": "House Agriculture, State and Public Lands & Water ",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117HW001",
      "house": "H",
      "order": "Committee of the Whole",
      "sequence": "001",
      "status": "Adopted",
      "sponsor": "Representative Schmid",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117HW002",
      "house": "H",
      "order": "Committee of the Whole",
      "sequence": "002",
      "status": "Withdrawn",
      "sponsor": "Representative Larson, JT",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117HW003",
      "house": "H",
      "order": "Committee of the Whole",
      "sequence": "003",
      "status": "Failed",
      "sponsor": "Representative Yin",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117HW004",
      "house": "H",
      "order": "Committee of the Whole",
      "sequence": "004",
      "status": "Failed",
      "sponsor": "Representative Larson, JT",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117HW005",
      "house": "H",
      "order": "Committee of the Whole",
      "sequence": "005",
      "status": "Failed",
      "sponsor": "Representative Harshman",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117S2001",
      "house": "S",
      "order": "2nd reading",
      "sequence": "001",
      "status": "Failed",
      "sponsor": "Senator Laursen, D",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117S2002",
      "house": "S",
      "order": "2nd reading",
      "sequence": "002",
      "status": "Adopted",
      "sponsor": "Senator Steinmetz",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117S3001",
      "house": "S",
      "order": "3rd reading",
      "sequence": "001",
      "status": "Adopted",
      "sponsor": "Senator Jones",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117S3002",
      "house": "S",
      "order": "3rd reading",
      "sequence": "002",
      "status": "Withdrawn",
      "sponsor": "Senator Driskill",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117S3003",
      "house": "S",
      "order": "3rd reading",
      "sequence": "003",
      "status": "Adopted",
      "sponsor": "Senator Jones",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117S3004",
      "house": "S",
      "order": "3rd reading",
      "sequence": "004",
      "status": "Corrected, Failed",
      "sponsor": "Senator Hicks",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117S3005",
      "house": "S",
      "order": "3rd reading",
      "sequence": "005",
      "status": "Adopted",
      "sponsor": "Senator Nethercott",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117S3006",
      "house": "S",
      "order": "3rd reading",
      "sequence": "006",
      "status": "Adopted",
      "sponsor": "Senator Driskill",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117SS001",
      "house": "S",
      "order": "Standing Committee",
      "sequence": "001",
      "status": "Adopted",
      "sponsor": "Senate Agriculture, State and Public Lands & Water Resources Committee",
      "id": 0,
      "amendmentBudgetSections": []
    },
    {
      "amendmentNumber": "HB0117SS002",
      "house": "S",
      "order": "Standing Committee",
      "sequence": "002",
      "status": "Adopted",
      "sponsor": "Senate Appropriations Committee",
      "id": 0,
      "amendmentBudgetSections": []
    }
  ],
  "sponsors": [
    {
      "name": "Water",
      "primarySponsor": true,
      "house": null,
      "sponsorTitle": null
    }
  ],
  "billActions": [
    {
      "statusDate": "2025-03-04T20:00:00",
      "statusMessage": "Assigned Chapter Number 111",
      "voteId": "",
      "billInformationID": 12549,
      "location": "LSO"
    },
    {
      "statusDate": "2025-03-04T19:29:00",
      "statusMessage": "Governor Line-Item Vetoed HEA No. 0056 ",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Governor"
    },
    {
      "statusDate": "2025-03-04T19:27:00",
      "statusMessage": "Veto Message Received",
      "voteId": "",
      "billInformationID": 12549,
      "location": ""
    },
    {
      "statusDate": "2025-03-04T07:28:51",
      "statusMessage": "Governor Signed HEA No. 0056 ",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Governor"
    },
    {
      "statusDate": "2025-02-28T19:22:14",
      "statusMessage": "S President Signed HEA No. 0056",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-28T19:15:27",
      "statusMessage": "H Speaker Signed HEA No. 0056",
      "voteId": "",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-02-28T19:14:23",
      "statusMessage": "Assigned Number HEA No. 0056",
      "voteId": "",
      "billInformationID": 12549,
      "location": "LSO"
    },
    {
      "statusDate": "2025-02-28T16:41:48",
      "statusMessage": "H Concur:Passed 34-26-2-0-0",
      "voteId": "1433",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-02-28T13:56:14",
      "statusMessage": "H Received for Concurrence",
      "voteId": "",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-02-28T11:41:18",
      "statusMessage": "S 3rd Reading:Passed 29-2-0-0-0",
      "voteId": "533",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-27T14:43:54",
      "statusMessage": "S 3rd Reading:Laid Back",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-26T11:33:34",
      "statusMessage": "S 3rd Reading:Laid Back",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-25T11:37:31",
      "statusMessage": "S 2nd Reading:Passed",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-24T15:45:00",
      "statusMessage": "S COW:Passed",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-20T16:31:16",
      "statusMessage": "S Placed on General File",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-20T16:31:10",
      "statusMessage": "S02 - Appropriations:Recommend Amend and Do Pass 4-0-1-0-0",
      "voteId": "-677",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-18T14:22:01",
      "statusMessage": ":Rerefer to S02 - Appropriations",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-18T14:19:10",
      "statusMessage": "S05 - Agriculture:Recommend Amend and Do Pass 5-0-0-0-0",
      "voteId": "-618",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-13T10:17:15",
      "statusMessage": "S Introduced and Referred to S05 - Agriculture",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-13T08:47:39",
      "statusMessage": "S Received for Introduction",
      "voteId": "",
      "billInformationID": 12549,
      "location": "Senate"
    },
    {
      "statusDate": "2025-02-12T11:41:36",
      "statusMessage": "H 3rd Reading:Passed 58-2-2-0-0",
      "voteId": "1262",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-02-11T11:29:54",
      "statusMessage": "H 2nd Reading:Passed",
      "voteId": "",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-02-10T12:53:30",
      "statusMessage": "H COW:Passed",
      "voteId": "",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-02-06T19:15:51",
      "statusMessage": "H Placed on General File",
      "voteId": "",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-02-06T19:15:42",
      "statusMessage": "H02 - Appropriations:Recommend Do Pass 7-0-0-0-0",
      "voteId": "-466",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-02-04T18:48:40",
      "statusMessage": ":Rerefer to H02 - Appropriations",
      "voteId": "",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-02-04T18:48:31",
      "statusMessage": "H05 - Agriculture:Recommend Amend and Do Pass 9-0-0-0-0",
      "voteId": "-420",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-01-24T11:08:49",
      "statusMessage": "H Introduced and Referred to H05 - Agriculture",
      "voteId": "",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-01-07T12:04:55",
      "statusMessage": "H Received for Introduction",
      "voteId": "",
      "billInformationID": 12549,
      "location": "House"
    },
    {
      "statusDate": "2025-01-06T16:35:51",
      "statusMessage": "Bill Number Assigned",
      "voteId": "",
      "billInformationID": 12549,
      "location": "LSO"
    }
  ],
  "substituteBills": [],
  "vetoes": [
    {
      "vetoLinkText": "Governor's Line Item Veto Message",
      "vetoLinkPath": "2025/Veto/HB0117-LineItem-Veto.pdf",
      "customEnrolledLinkText": null,
      "customEnrolledPath": null,
      "sortOrder": 10,
      "linkType": "Veto",
      "id": 0,
      "billInformationID": 0
    },
    {
      "vetoLinkText": "Chaptered Law with Final Veto Actions",
      "vetoLinkPath": "2025/Veto/HB0117-Chapter.pdf",
      "customEnrolledLinkText": null,
      "customEnrolledPath": null,
      "sortOrder": 20,
      "linkType": "Veto",
      "id": 0,
      "billInformationID": 0
    }
  ]
}