SF0002S2002
(CORRECTED
COPY)(CORRECTED COPY)
[BUDGET AFFECTED]
Budget(s): 316. School Capital Construction – Pipeline Projects
* * * * * * * * * *
Page 73-line 20 Under OTHER FUNDS increase amount by "50,776,506S6".
Page 76-line 16 Delete "One" insert "One million seven hundred seventy-six thousand five hundred ninety dollars ($1,776,590.00)".
Page 76-line 17 Delete line through "($1,395,581.00)".
Page 76-line 22 Delete "Twenty-" insert "Thirty-four million six hundred twenty-seven thousand four hundred eighty-one dollars ($34,627,481.00)".
Page 76-line 23 Delete line through "($24,080,081.00)".
Page 76-line 25 Delete "seven (7)" insert "six (6)".
Page 76-line 28 After stricken "($5,540,539.00)" delete balance of line insert "Thirty-eight million one hundred thirty-five thousand two hundred eighty-seven dollars ($38,135,287.00)".
Page 76-line 29 Delete "($1,517,398.00)"; reinsert stricken language.
Page 76-line 30 Reinsert stricken language.
Page 76-line 34 After stricken "($10,919,190.00)" delete balance of line and insert "Fifteen million one hundred seventy thousand dollars ($15,170,000.00)".
Page 76-line 35 Delete "dollars ($11,939,792.00)".
Page 77-line 29 After "." insert "If any or all bids on a project funded under this footnote are less than the amount specified under this footnote, the difference shall be deposited within the school capital construction account.".
Page 78-line 26 After "." insert "If any or all bids on a project funded under this footnote are less than the amount specified under this footnote, the difference shall be deposited within the school capital construction account.".
To the extent required by this amendment: adjust totals; and renumber as necessary. SCHIFFER, PECK, GEIS, HAWKS, SCOTT